Transcontinental Gas Pipe Line CP23-490
From the ProvenHand pipeline wiki
Transcontinental Gas Pipe Line CP23-490 is a natural gas facility project in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC.
| Transcontinental Gas Pipe Line CP23-490 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Replacement[1] |
| Status | Approved[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Alabama[3] |
| Counties | Chilton[3] |
| FERC docket | CP23-490[1] |
| Technical information | |
| Cost | approximately $59.4 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
Transcontinental Gas Pipe Line CP23-490 is a natural gas facility project in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Transcontinental Gas Pipe Line CP23-490? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-490”. Federal Energy Regulatory Commission. 1 June 2023. Retrieved 3 October 2026.
- “Environmental Assessment Report, Transco Section 2.55(b) replacement, Compressor Station 100 (CP23-490)”. Federal Energy Regulatory Commission (Office of Energy Projects). 30 June 2023. Retrieved 4 October 2026.
- “2.55(b) Advance Notification of Natural Gas Facilities Replacement for the Compressor Station 100 (CP23-490)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 1 June 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.