transports Weaver's Cove's 800 MMcf/d
From the ProvenHand pipeline wiki
transports Weaver's Cove's 800 MMcf/d is a pipeline project in Massachusetts, operated by Mill River Pipeline, LLC. It runs 6.1 miles.
| transports Weaver's Cove's 800 MMcf/d | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | Massachusetts[1] |
| Approved | 15 July 2005[1] |
| FERC docket | CP04-41[1] |
| Technical information | |
| Length | 6.1 mi[1] |
| Capacity | 800 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
transports Weaver's Cove's 800 MMcf/d is a pipeline project in Massachusetts, operated by Mill River Pipeline, LLC. It runs 6.1 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on transports Weaver's Cove's 800 MMcf/d? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.