Tres Palacios Copano Interconnect

From the ProvenHand pipeline wiki

Tres Palacios Copano Interconnect is a natural gas pipeline lateral in Texas, operated by Tres Palacios Gas Storage LLC. It entered service in 2013. It runs 19.7 miles of 24" pipe.

Tres Palacios Copano Interconnect
Also calledCopano Plant Interconnect Project[1]
General information
KindPipeline project[2]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StateTexas[2]
CountiesColorado, Wharton[3]
Approved5 December 2012[3]
In service23 May 2013[2]
FERC docketCP12-36[2]
Technical information
Length19.7 mi[2]
Pipe size24"[2]
Capacity400 MMcf/d additional capacity (EIA)[2]
On ProvenHand
Hands listed0

Tres Palacios Copano Interconnect is a natural gas pipeline lateral in Texas, operated by Tres Palacios Gas Storage LLC. It entered service in 2013. It runs 19.7 miles of 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Tres Palacios Copano Interconnect? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP12-36”. Federal Energy Regulatory Commission. 21 December 2011. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Tres Palacios Gas Storage LLC, Copano Plant Interconnect (CP12-36)”. FERC (order). 5 December 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.