Tres Palacios Copano Interconnect
From the ProvenHand pipeline wiki
Tres Palacios Copano Interconnect is a natural gas pipeline lateral in Texas, operated by Tres Palacios Gas Storage LLC. It entered service in 2013. It runs 19.7 miles of 24" pipe.
| Tres Palacios Copano Interconnect | |
|---|---|
| Also called | Copano Plant Interconnect Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Texas[2] |
| Counties | Colorado, Wharton[3] |
| Approved | 5 December 2012[3] |
| In service | 23 May 2013[2] |
| FERC docket | CP12-36[2] |
| Technical information | |
| Length | 19.7 mi[2] |
| Pipe size | 24"[2] |
| Capacity | 400 MMcf/d additional capacity (EIA)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Tres Palacios Copano Interconnect is a natural gas pipeline lateral in Texas, operated by Tres Palacios Gas Storage LLC. It entered service in 2013. It runs 19.7 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tres Palacios Copano Interconnect? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP12-36”. Federal Energy Regulatory Commission. 21 December 2011. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Tres Palacios Gas Storage LLC, Copano Plant Interconnect (CP12-36)”. FERC (order). 5 December 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.