Tres Palacios Storage Lateral
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Tres Palacios Storage Lateral is a natural gas pipeline lateral in Texas, operated by NGS Investments LLC. It entered service in 2008. It runs 41.7 miles of 36" pipe.
| Tres Palacios Storage Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| Facility project | |
| State | Texas[1] |
| Approved | 20 September 2007[4] |
| In service | October 2008[1][5] |
| FERC docket | CP07-90[1] |
| Technical information | |
| Length | 41.7 mi[1] |
| Pipe size | 36 in[1] or 24 in[4][sources disagree] |
| Capacity | 2500 MMcf/d additional capacity (EIA)[1] |
| Cost | $60 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Tres Palacios Storage Lateral is a natural gas pipeline lateral in Texas, operated by NGS Investments LLC. It entered service in 2008. It runs 41.7 miles of 36" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tres Palacios Storage Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-90”. Federal Energy Regulatory Commission. 23 February 2007. Retrieved 3 October 2026.
- “Environmental Assessment Report, Compressor Substitution Project, Tres Palacios Gas Storage LLC (CP11-507)”. Federal Energy Regulatory Commission. 5 August 2011. Retrieved 4 October 2026.
- “Order Issuing Certificates, Tres Palacios Gas Storage, LLC (CP07-90, CP07-91, CP07-92)”. Federal Energy Regulatory Commission. 20 September 2007. Retrieved 4 October 2026.
- “Natural Gas Storage Facility Commences Service in Southeastern Texas”. Industrial Info Resources. 27 October 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.