Triple-T Extension Project is a natural gas pipeline in Louisiana, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2006 and the line entered service in 2007. It runs 6.2 miles of 24" pipe.

Triple-T Extension Project
General information
KindPipeline project[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateLouisiana[1]
Approved15 December 2005[1][3]
Construction started26 August 2006[4]
In service14 September 2007[2]
FERC docketCP05-416[1]
Technical information
Length6.2 mi[1][3]
Pipe size24"[3]
Capacity200 MMcf/d (FERC project list)[1] or up to 200 MMcf/d[3][sources disagree]
On ProvenHand
Hands listed0

Triple-T Extension Project is a natural gas pipeline in Louisiana, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2006 and the line entered service in 2007. It runs 6.2 miles of 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 200 MMcf/d (FERC project list)[1]
  • up to 200 MMcf/d[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Triple-T Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “Notification that the Triple-T Extension facilities were constructed and available for service 9/14/07 (CP05-416)”. Federal Energy Regulatory Commission. 24 September 2007. Retrieved 4 October 2026.
  3. “Order issuing certificate, Tennessee Gas Pipeline (Triple-T Extension Project, CP05-416)”. Federal Energy Regulatory Commission. 15 December 2005. Retrieved 4 October 2026.
  4. “Notification that construction of the Triple-T Extension Project commenced 8/26/06 (CP05-416)”. Federal Energy Regulatory Commission. 30 August 2006. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.