Trunkline Backhaul Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Trunkline Backhaul Project is a natural gas pipeline reversal, operated by Trunkline Gas Company, LLC. It was built and entered service in 2017.

Trunkline Backhaul Project
General information
KindPipeline project[1]
Project typeReversal[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesIL, MS, TN[1] or IL, KY, MS, TN[2][sources disagree]
Approved2 February 2017[1]
Construction started9 March 2017[3]
In service31 August 2017[2]
FERC docketCP15-96[1]
Technical information
Capacity750 MMcf/d (FERC project list)[1] or 800 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$51 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Trunkline Backhaul Project is a natural gas pipeline reversal, operated by Trunkline Gas Company, LLC. It was built and entered service in 2017.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 750 MMcf/d (FERC project list)[1]
  • 800 MMcf/d additional capacity (EIA)[2]
States
  • IL, MS, TN[1]
  • IL, KY, MS, TN[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Trunkline Backhaul Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Construction, Rover, Panhandle Backhaul and Trunkline Backhaul Projects (CP15-93, CP15-94, CP15-96)”. Rover Pipeline LLC et al. (filed with FERC). 14 March 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.