Turnpike and Sand Lake Road Relocation Project is a pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC.
| Turnpike and Sand Lake Road Relocation Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Owner and operator | |
| State | Florida[2] |
| Counties | Orange[2] |
| Approved | 16 September 2023[4] |
| FERC docket | CP23-510[1] |
| Technical information | |
| Cost | $18.9 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Turnpike and Sand Lake Road Relocation Project is a pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Turnpike and Sand Lake Road Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-510”. Federal Energy Regulatory Commission. 5 July 2023. Retrieved 3 October 2026.
- “Environmental Assessment Report, Florida Gas Transmission Turnpike and Sand Lake Road Relocation Project (CP23-510)”. Federal Energy Regulatory Commission (Office of Energy Projects). 14 September 2023. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 17, final report, Turnpike and Sand Lake Road Relocation Project (CP23-510)”. Florida Gas Transmission Company, LLC (filed with FERC). 6 June 2024. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 1 (February 2024), Turnpike and Sand Lake Road Relocation Project (CP23-510)”. Florida Gas Transmission Company, LLC (filed with FERC). 15 February 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.