T.W. Phillips Bionol Clearfield Pipeline Proj
From the ProvenHand pipeline wiki
T.W. Phillips Bionol Clearfield Pipeline Proj is a natural gas pipeline in Pennsylvania, operated by T.W. Phillips Pipeline Corp. It entered service in 2010. It runs 8 miles of 6" pipe.
| T.W. Phillips Bionol Clearfield Pipeline Proj | |
|---|---|
| Also called | Bionol Project[1], Bionol Clearfield Pipeline Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Project type | New build[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Operator | |
| Owner and operator | |
| State | Pennsylvania[3] |
| Approved | 19 February 2009[2] |
| In service | 8 January 2010[3] |
| FERC docket | CP09-3[3] |
| FERC pre-filing docket | PF08-19[1] |
| Technical information | |
| Length | 8 mi[3] |
| Pipe size | 6"[3] |
| Capacity | 11.2 MMcf/d additional capacity (EIA)[3] |
| Cost | $7.1 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
T.W. Phillips Bionol Clearfield Pipeline Proj is a natural gas pipeline in Pennsylvania, operated by T.W. Phillips Pipeline Corp. It entered service in 2010. It runs 8 miles of 6" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on T.W. Phillips Bionol Clearfield Pipeline Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP09-3”. Federal Energy Regulatory Commission. 6 October 2008. Retrieved 3 October 2026.
- “Order Issuing Certificate re T.W. Phillips Pipeline Corporation (CP09-3 et al.), eLibrary filing description”. FERC. 19 February 2009. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.