T.W. Phillips Bionol Clearfield Pipeline Proj

From the ProvenHand pipeline wiki

T.W. Phillips Bionol Clearfield Pipeline Proj is a natural gas pipeline in Pennsylvania, operated by T.W. Phillips Pipeline Corp. It entered service in 2010. It runs 8 miles of 6" pipe.

T.W. Phillips Bionol Clearfield Pipeline Proj
Also calledBionol Project[1], Bionol Clearfield Pipeline Project[2]
General information
KindPipeline project[3]
Project typeNew build[3]
StatusIn service[3]
CommodityNatural gas[3]
Operator
Owner and operator
StatePennsylvania[3]
Approved19 February 2009[2]
In service8 January 2010[3]
FERC docketCP09-3[3]
FERC pre-filing docketPF08-19[1]
Technical information
Length8 mi[3]
Pipe size6"[3]
Capacity11.2 MMcf/d additional capacity (EIA)[3]
Cost$7.1 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

T.W. Phillips Bionol Clearfield Pipeline Proj is a natural gas pipeline in Pennsylvania, operated by T.W. Phillips Pipeline Corp. It entered service in 2010. It runs 8 miles of 6" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on T.W. Phillips Bionol Clearfield Pipeline Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP09-3”. Federal Energy Regulatory Commission. 6 October 2008. Retrieved 3 October 2026.
  2. “Order Issuing Certificate re T.W. Phillips Pipeline Corporation (CP09-3 et al.), eLibrary filing description”. FERC. 19 February 2009. Retrieved 4 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.