Upper Arlington NCHP Pipeline Project

From the ProvenHand pipeline wiki

Upper Arlington NCHP Pipeline Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 4.6 miles of 20" pipe.

Upper Arlington NCHP Pipeline Project
Also calledUpper Arlington NCHP Pipeline Replacement Project[1], Upper Arlington North Columbus High Pressure Pipeline Replacement Project[2]
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusUnder construction[2]
CommodityNatural gas[1]
Owner and operator
StateOhio[3]
CountiesFranklin[1]
Ohio Power Siting Board case25-0890-GA-BLN[3]
Technical information
Length4.6 mi[1]
Pipe size20"[1]
Wall thickness0.375 in[1]
On ProvenHand
Hands listed0

Upper Arlington NCHP Pipeline Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 4.6 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Upper Arlington NCHP Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Letter of Notification, Upper Arlington NCHP Pipeline Project, OPSB Case No. 25-0890-GA-BLN”. Columbia Gas of Ohio, Inc. (filed with the Ohio Power Siting Board; copy on columbiagasohio.com). 24 September 2025. Retrieved 3 October 2026.
  2. “PUCO Docketing Information System, case record and docket list for OPSB case 25-0890”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
  3. “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.