UPS Hodgkins Delivery Meter Station Project
From the ProvenHand pipeline wiki
UPS Hodgkins Delivery Meter Station Project is a natural gas facility project in Illinois, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2024.
| UPS Hodgkins Delivery Meter Station Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Illinois[2] |
| Counties | Cook[2] |
| Construction started | 24 September 2024[4] |
| FERC docket | CP24-491[1] |
| Technical information | |
| Cost | $2,200,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
UPS Hodgkins Delivery Meter Station Project is a natural gas facility project in Illinois, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2024.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on UPS Hodgkins Delivery Meter Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-491”. Federal Energy Regulatory Commission. 12 July 2024. Retrieved 3 October 2026.
- “Environmental Assessment Report, Natural Gas Pipeline Company of America UPS Hodgkins Delivery Meter Station Project (CP24-491)”. Federal Energy Regulatory Commission (Office of Energy Projects). 20 September 2024. Retrieved 3 October 2026.
- “Weekly Status Report No. 9 (final, 11/18/2024 to 11/24/2024), UPS Hodgkins Delivery Meter Station Project (CP24-491)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 25 November 2024. Retrieved 3 October 2026.
- “Weekly Status Report No. 1 (09/23/2024 to 09/29/2024), UPS Hodgkins Delivery Meter Station Project (CP24-491)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 2 October 2024. Retrieved 3 October 2026.