Utica Access Project is a natural gas pipeline lateral in West Virginia, operated by Columbia Gas Transmission, LLC. It runs 5 miles of 24" pipe.

Utica Access Project
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2][3]
CommodityNatural gas[2][4]
Owner and operator
StateWest Virginia[1][2][4]
Approved30 December 2015[1][4]
In service30 September 2016[2] or 29 September 2016[3][sources disagree]
FERC docketCP15-87[1]
Technical information
Length5 mi[1][2][4]
Pipe size24"[4]
Capacity205 MMcf/d (FERC project list)[1][2] or 205,000 Dth per day of firm transportation service[4][sources disagree]
Cost$45 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Utica Access Project is a natural gas pipeline lateral in West Virginia, operated by Columbia Gas Transmission, LLC. It runs 5 miles of 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 205 MMcf/d (FERC project list)[1][2]
  • 205,000 Dth per day of firm transportation service[4]
In service
  • 30 September 2016[2]
  • 29 September 2016[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Utica Access Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “In-service date and Affirmative Statement, Utica Access Project (CP15-87)”. Columbia Pipeline Group, for Columbia Gas Transmission, LLC (filed with FERC). 7 October 2016. Retrieved 4 October 2026.
  4. “Order Issuing Certificates, Dominion Transmission, Inc., Monroe to Cornwell Project (CP15-7 et al.)”. FERC. 30 December 2015. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.