Valley Lateral Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Valley Lateral Project is a natural gas pipeline lateral in New York, operated by Millennium Pipeline Company, L.L.C.. It entered service in 2018.
| Valley Lateral Project | |
|---|---|
| Also called | CPV Valley lateral project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | New York[1][2] |
| Approved | 9 November 2016[1] |
| In service | 9 July 2018[2] |
| FERC docket | CP16-17[1] |
| FERC pre-filing docket | PF15-23[1] |
| Contractors | |
| Technical information | |
| Length | 7.8 mi[1] or 8 mi[2][sources disagree] |
| Pipe size | 16"[2] |
| Capacity | 130 MMcf/d (FERC project list)[1][2] |
| Cost | $40 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Valley Lateral Project is a natural gas pipeline lateral in New York, operated by Millennium Pipeline Company, L.L.C.. It entered service in 2018.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Otis Eastern Service, LLC[4] | Prime | Listed 2018 as contractor: 7.8-mile 16-inch lateral in Orange County, NY |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Valley Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP16-17”. Federal Energy Regulatory Commission. 13 November 2015. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.