Venture Global CP Express CP2 LNG
From the ProvenHand pipeline wiki
Venture Global CP Express CP2 LNG is a natural gas facility project at CP2 LNG in Louisiana, operated by Venture Global CP Express, LLC. Construction began in 2025.
| Venture Global CP Express CP2 LNG | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | New build[2] |
| Status | Under construction[3][4] |
| Commodity | Natural gas[2] |
| Owners and operators | |
| Owner | |
| Facility | CP2 LNG[3] |
| State | Louisiana[3] |
| Counties | Cameron[2] |
| Approved | 27 June 2024[2] |
| Construction started | June 2025[4][5] |
| FERC docket | CP22-21[1] |
| Doe lng docket | 21-131-LNG[6] |
| Contractors | |
| Technical information | |
| Capacity added | 3.96 Bcfd (FERC LNG map, Sep 2026)[3] |
| Liquefaction added | 20 MTPA[2] |
| On ProvenHand | |
| Hands listed | 0 |
Venture Global CP Express CP2 LNG is a natural gas facility project at CP2 LNG in Louisiana, operated by Venture Global CP Express, LLC. Construction began in 2025.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Worley[7][8] | Prime | EPC contract for Phase 1 (engineering, procurement, construction, commissioning and start-up), awarded May 2023 |
| CB&I LLC[7] | LNG storage tank EPC | Engineering, procurement and construction contract for the Phase 1 LNG storage tanks, June 2023 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Venture Global CP Express CP2 LNG? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-21”. Federal Energy Regulatory Commission. 2 December 2021. Retrieved 3 October 2026.
- “Order Granting Authorizations Under Sections 3 and 7 of the Natural Gas Act, Venture Global CP2 LNG, LLC and Venture Global CP Express, LLC (CP22-21, CP22-22), 187 FERC 61,199”. Federal Energy Regulatory Commission. 27 June 2024. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Monthly Construction Status Report No. 12 for June 2025, CP2 LNG Project (CP22-21, CP22-22)”. Venture Global CP2 LNG, LLC (filed with FERC). 8 July 2025. Retrieved 3 October 2026.
- “Venture Global CP2 LNG terminal progresses to construction start”. LNG Industry. 16 June 2025. Retrieved 3 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Venture Global, Inc. prospectus (Rule 424(b)(4))”. Venture Global, Inc. (SEC EDGAR). 23 January 2025. Retrieved 3 October 2026.
- “Venture Global CP2 awards Phase 1 EPC contract to Worley”. Oil & Gas Journal. 10 May 2023. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.