VEPCO-Warren County Project
From the ProvenHand pipeline wiki
VEPCO-Warren County Project is a natural gas pipeline expansion in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2012 and the line entered service in 2013. It runs 2.5 miles of 24" pipe.
| VEPCO-Warren County Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Maryland, Virginia, West Virginia[1][2] |
| Approved | 20 March 2012[1][3] |
| Construction started | 2012[4] |
| In service | October 2013[2] |
| FERC docket | CP11-490[1] |
| Technical information | |
| Length | 2.5 mi[1][2][3] |
| Pipe size | 24"[2][3] |
| Capacity | 246 MMcf/d (FERC project list)[1][2] |
| Cost | $34.3 million (EIA estimate; no dollar year given)[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
VEPCO-Warren County Project is a natural gas pipeline expansion in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2012 and the line entered service in 2013. It runs 2.5 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on VEPCO-Warren County Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, VEPCO-Warren County Project (CP11-490)”. Federal Energy Regulatory Commission. 20 March 2012. Retrieved 4 October 2026.
- “Biweekly Construction Status Report No. 1, VEPCO-Warren County Project (CP11-490)”. Columbia Gas Transmission, LLC (filed with FERC). 5 December 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.