VR-22 to Shore Abandonment Project
From the ProvenHand pipeline wiki
VR-22 to Shore Abandonment Project is a natural gas pipeline in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2022. It runs 12.6 miles of 24" pipe.
| VR-22 to Shore Abandonment Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Owners | |
| State | Louisiana[3] |
| Counties | Vermilion[2] |
| Approved | 12 January 2022[3] or 18 March 2021[4][sources disagree] |
| Construction started | 6 July 2022[5] |
| FERC docket | CP20-507[1] |
| Louisiana coastal use permit | P20210802[3] |
| Technical information | |
| Length | 12.6 mi[2] |
| Pipe size | 24"[3] |
| On ProvenHand | |
| Hands listed | 0 |
VR-22 to Shore Abandonment Project is a natural gas pipeline in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2022. It runs 12.6 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on VR-22 to Shore Abandonment Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Monthly Construction Status Report (Nov 12 to Dec 12, 2021), VR-22 to Shore Abandonment Project (CP20-507), with copy of Louisiana coastal use permit P20210802”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 19 January 2022. Retrieved 3 October 2026.
- “Environmental Assessment, VR-22 to Shore Abandonment Project (CP20-507)”. FERC Office of Energy Projects. 19 February 2021. Retrieved 3 October 2026.
- “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
- “Order Granting Abandonment, Transcontinental Gas Pipe Line Company, LLC, Sea Robin Pipeline Company, LLC and Florida Gas Transmission Company, LLC (CP20-507)”. FERC. 18 March 2021. Retrieved 3 October 2026.
- “Final Monthly Construction Status Report (July 28 to Aug 16, 2023), VR-22 to Shore Abandonment Project (CP20-507)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 September 2023. Retrieved 3 October 2026.