Wamsutter Expansion Project is a natural gas pipeline expansion in Wyoming, operated by Questar Overthrust Pipeline Company. It entered service in 2007.
| Wamsutter Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2][4] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Wyoming[1][2] |
| Approved | 19 April 2007[1][5] |
| In service | December 2007[2] |
| FERC docket | CP06-423[1] |
| FERC pre-filing docket | PF06-19[1] |
| Technical information | |
| Length | 77.3 mi[1] or 77 mi[2][sources disagree] |
| Pipe size | 36"[2] |
| Capacity | 750 MMcf/d (FERC project list)[1][2] |
| Cost | $202.3 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Wamsutter Expansion Project is a natural gas pipeline expansion in Wyoming, operated by Questar Overthrust Pipeline Company. It entered service in 2007.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Wamsutter Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP06-423”. Federal Energy Regulatory Commission. 19 July 2006. Retrieved 3 October 2026.
- “Letter order granting Questar Pipeline Company's request to commence service on the entire Wamsutter Expansion Project (CP06-423)”. FERC (Office of Energy Projects). 30 November 2007. Retrieved 4 October 2026.
- “Order issuing certificates, approving abandonment, and denying rehearing, Rockies Express Pipeline, LLC et al. (CP06-354 et al., incl. the Wamsutter Expansion Project, CP06-423)”. FERC. 19 April 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.