Wax Lake Remediation Project
From the ProvenHand pipeline wiki
Wax Lake Remediation Project is a pipeline lateral in Louisiana, operated by Columbia Gulf Transmission, LLC. Construction began in 2025.
| Wax Lake Remediation Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[2] |
| Owner and operator | |
| State | Louisiana[3] |
| Counties | St. Mary[3] |
| Approved | 30 July 2024[4] |
| Construction started | 17 February 2025[4] |
| FERC docket | CP24-471[1] |
| Technical information | |
| Pipe size | 30"[3] |
| Cost | $16,600,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Wax Lake Remediation Project is a pipeline lateral in Louisiana, operated by Columbia Gulf Transmission, LLC. Construction began in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Wax Lake Remediation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-471”. Federal Energy Regulatory Commission. 23 May 2024. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 25 (final, period beginning 08/04/2025), Wax Lake Remediation Project (CP24-471)”. Columbia Gulf Transmission, LLC (filed with FERC). 21 August 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report, Columbia Gulf Wax Lake Remediation Project (CP24-471)”. Federal Energy Regulatory Commission (Office of Energy Projects). 29 July 2024. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 1 (2/17/2025 onward), Wax Lake Remediation Project (CP24-471)”. Columbia Gulf Transmission, LLC (filed with FERC). 26 February 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.