WBI Energy Transmission CP14-131
From the ProvenHand pipeline wiki
WBI Energy Transmission CP14-131 is a natural gas facility project in North Dakota, operated by WBI Energy Transmission, Inc..
| WBI Energy Transmission CP14-131 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | Stark[2] |
| FERC docket | CP14-131[1] |
| Technical information | |
| Capacity | up to 9,744 Mcf/day of natural gas to Dakota Prairie Refining[2] |
| On ProvenHand | |
| Hands listed | 0 |
WBI Energy Transmission CP14-131 is a natural gas facility project in North Dakota, operated by WBI Energy Transmission, Inc..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on WBI Energy Transmission CP14-131? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP14-131”. Federal Energy Regulatory Commission. 1 April 2014. Retrieved 3 October 2026.
- “Prior Notice Request for Authorization to Construct and Operate Delivery Point Facilities, WBI Energy Transmission, Inc. (CP14-131)”. WBI Energy Transmission, Inc. (filed with FERC). 1 April 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.