WBI Energy Transmission CP14-505
From the ProvenHand pipeline wiki
WBI Energy Transmission CP14-505 is a natural gas facility project in Montana, operated by WBI Energy Transmission, Inc.. It was built and entered service in 2014.
| WBI Energy Transmission CP14-505 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Montana[3] |
| Counties | Fallon[3] |
| Construction started | 4 September 2014[4] |
| In service | November 2014[2] |
| FERC docket | CP14-505[1] |
| Technical information | |
| Cost | approximately $1.25 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
WBI Energy Transmission CP14-505 is a natural gas facility project in Montana, operated by WBI Energy Transmission, Inc.. It was built and entered service in 2014.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on WBI Energy Transmission CP14-505? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP14-505”. Federal Energy Regulatory Commission. 24 June 2014. Retrieved 3 October 2026.
- “Weekly Construction Progress Report No. 12 (week ending 11/23/14) (CP14-505)”. WBI Energy Transmission, Inc. (filed with FERC). 26 November 2014. Retrieved 3 October 2026.
- “Prior Notice Application to replace natural gas compression facilities at the Baker Compressor Station, Fallon County, Montana (CP14-505)”. WBI Energy Transmission, Inc. (filed with FERC). 24 June 2014. Retrieved 3 October 2026.
- “Weekly Construction Progress Report No. 1 (week ending 9/7/14) (CP14-505)”. WBI Energy Transmission, Inc. (filed with FERC). 9 September 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.