We Port Washington Lateral
From the ProvenHand pipeline wiki
We Port Washington Lateral is a natural gas pipeline lateral in Wisconsin, operated by We Energies Inc. It entered service in 2004. It runs 16.5 miles of 20", 24" pipe.
| We Port Washington Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Wisconsin[1] |
| In service | 6 December 2004[1] |
| Contractors | |
| Technical information | |
| Length | 16.5 mi[1] |
| Pipe size | 20", 24"[1] |
| Capacity | 143 MMcf/d additional capacity (EIA)[1] |
| Cost | $46 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
We Port Washington Lateral is a natural gas pipeline lateral in Wisconsin, operated by We Energies Inc. It entered service in 2004. It runs 16.5 miles of 20", 24" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Brandenburg Drainage, Inc.[2] | Drain tile installation and repair | Wisconsin, through H.C. Price: 11 miles of drain tile repairs | 1 August 2004 – 1 September 2004 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on We Port Washington Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Brandenburg Drainage, Inc. - Resume (archive 2020-02-22)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.