Webb Storage Field Replacement Project

From the ProvenHand pipeline wiki

Webb Storage Field Replacement Project is a natural gas pipeline replacement in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2026.

Webb Storage Field Replacement Project
Also calledReplacement Well No. 222 at Webb Storage Field and Lateral Project[1]
General information
Project typeReplacement[2]
StatusUnder construction[3][4]
CommodityNatural gas[5]
Owner and operator
StateOklahoma[5]
CountiesGrant[5]
Construction startedApril 2026[6]
FERC docketCP26-77[2]
Technical information
Pipe size4"[5]
Cost$8,500,000[5]
On ProvenHand
Hands listed0

Webb Storage Field Replacement Project is a natural gas pipeline replacement in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2026.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Webb Storage Field Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Prior Notice Request, Replacement Well No. 222 at Webb Storage Field and Lateral Project (CP26-77)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 27 January 2026. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP26-77”. Federal Energy Regulatory Commission. 27 January 2026. Retrieved 3 October 2026.
  3. “Weekly Environmental Report No. 25 (9/20/2026 to 9/26/2026), Replacement Well No. 222 and Lateral Project (CP26-77)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
  4. “Weekly Environmental Report No. 24 (Sept 13 to 19, 2026), Replacement Well No. 222 at the Webb Storage Field (CP26-77)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 25 September 2026. Retrieved 4 October 2026.
  5. “Environmental Assessment Report, Southern Star Webb Storage Field Replacement Project (CP26-77)”. Federal Energy Regulatory Commission (Office of Energy Projects). 7 April 2026. Retrieved 3 October 2026.
  6. “Weekly Environmental Report No. 1 (4/06/2026 onward), Replacement Well No. 222 and Lateral Project (CP26-77)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 16 April 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.