West Leg Expansion
From the ProvenHand pipeline wiki
West Leg Expansion is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company. It entered service in 2004. It runs 32.8 miles of 12", 20", 30" pipe.
| West Leg Expansion | |
|---|---|
| Also called | ANR WestLeg Expansion[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Illinois, Wisconsin[1][2] |
| Approved | 5 June 2003[1] |
| In service | October 2004[2] |
| FERC docket | CP02-434[1] |
| Technical information | |
| Length | 32.8 mi[1][2] |
| Pipe size | 12", 20", 30"[2] |
| Capacity | 220 MMcf/d (FERC project list)[1][2] |
| Cost | $42.1 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
West Leg Expansion is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company. It entered service in 2004. It runs 32.8 miles of 12", 20", 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on West Leg Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.