West Leg Expansion

From the ProvenHand pipeline wiki

West Leg Expansion is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company. It entered service in 2004. It runs 32.8 miles of 12", 20", 30" pipe.

West Leg Expansion
Also calledANR WestLeg Expansion[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesIllinois, Wisconsin[1][2]
Approved5 June 2003[1]
In serviceOctober 2004[2]
FERC docketCP02-434[1]
Technical information
Length32.8 mi[1][2]
Pipe size12", 20", 30"[2]
Capacity220 MMcf/d (FERC project list)[1][2]
Cost$42.1 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

West Leg Expansion is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company. It entered service in 2004. It runs 32.8 miles of 12", 20", 30" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on West Leg Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.