West Side Expansion and Modernization Project
From the ProvenHand pipeline wiki
West Side Expansion and Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It runs 23 miles of 24" pipe.
| West Side Expansion and Modernization Project | |
|---|---|
| Also called | Line N West Side Expansion and Modernization Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| Facility project | |
| State | Pennsylvania[1][2] |
| Counties | Allegheny, Beaver, Washington[4] |
| Approved | 2 March 2015[1] |
| In service | 24 September 2015[2] or 16 October 2015[5][sources disagree] |
| FERC docket | CP14-70[1] |
| Contractors | |
| Technical information | |
| Length | 23 mi[1][2][4] |
| Pipe size | 24"[2][4] |
| Capacity | 175 MMcf/d (FERC project list)[1][2] |
| Cost | $76.1 million (EIA estimate; no dollar year given)[2] or $76,122,687 (National Fuel estimate in the certificate order)[4][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
West Side Expansion and Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It runs 23 miles of 24" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Associated Pipe Line Contractors, Inc.[6][7] | Prime | 23.2 miles of 24-inch new lay for National Fuel Gas Supply, pre-jobbed at Burgettstown, PA (firm's site: 23.5 miles of 24-inch, Washington and Beaver Counties, PA) | from 1 January 2015 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on West Side Expansion and Modernization Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-70”. Federal Energy Regulatory Commission. 6 February 2014. Retrieved 3 October 2026.
- “Order Issuing Certificate and Authorizing Abandonment, West Side Expansion and Modernization Project (CP14-70)”. Federal Energy Regulatory Commission. 2 March 2015. Retrieved 4 October 2026.
- “In Service Notice, West Side Expansion and Modernization Project (CP14-70)”. National Fuel Gas Supply Corporation (filed with FERC). 22 October 2015. Retrieved 4 October 2026.
- “Land Division (recent projects) (Wayback capture 2020-08-11)”. Associated Pipe Line Contractors, Inc. Archived from the original on 11 August 2020. Retrieved 3 October 2026.
- “Blue Light Reports, July 2015 (pre-jobs)”. Pipeliners Local Union 798. July 2015. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.