West Uprate and Blacksville Compressor Station Expansion Project
From the ProvenHand pipeline wiki
West Uprate and Blacksville Compressor Station Expansion Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 74 miles.
| West Uprate and Blacksville Compressor Station Expansion Project | |
|---|---|
| General information | |
| Status | Approved[1] or In service[2][sources disagree] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | Pennsylvania, West Virginia[3] |
| FERC docket | CP14-492[4] |
| Contractors | |
| Technical information | |
| Length | 74 mi[3] |
| Capacity added | approximately 100 MMcf/d of new capacity[3] |
| Cost | $26,600,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
West Uprate and Blacksville Compressor Station Expansion Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 74 miles.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Trinity Consultants[2] | acoustic consultant (post-construction noise survey) | performed the post-construction ambient sound survey of the Blacksville Compressor Station on 2015-02-03; no construction role is claimed |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on West Uprate and Blacksville Compressor Station Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, West Uprate and Blacksville Compressor Station Expansion Project, Equitrans, L.P. (CP14-492)”. FERC. 29 July 2014. Retrieved 4 October 2026.
- “Submission of required noise survey (Blacksville Compressor Station ambient sound monitoring report, February 2015), Equitrans, L.P. (CP14-492)”. Equitrans, L.P. (filed with FERC). 2 March 2015. Retrieved 4 October 2026.
- “Notice of Equitrans, L.P.'s 5/23/14 request under Blanket Authorization, uprate of 74 miles and Blacksville Compressor Station (CP14-492)”. FERC. 30 May 2014. Retrieved 4 October 2026.
- “FERC eLibrary docket CP14-492”. Federal Energy Regulatory Commission. 23 May 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.