West Uprate and Blacksville Compressor Station Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

West Uprate and Blacksville Compressor Station Expansion Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 74 miles.

West Uprate and Blacksville Compressor Station Expansion Project
General information
StatusApproved[1] or In service[2][sources disagree]
CommodityNatural gas[3]
Owner and operator
StatesPennsylvania, West Virginia[3]
FERC docketCP14-492[4]
Contractors
Technical information
Length74 mi[3]
Capacity addedapproximately 100 MMcf/d of new capacity[3]
Cost$26,600,000[1]
On ProvenHand
Hands listed0

West Uprate and Blacksville Compressor Station Expansion Project is a natural gas pipeline in Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 74 miles.

Contractorsedit

ContractorWorkScope
Trinity Consultants[2]acoustic consultant (post-construction noise survey)performed the post-construction ambient sound survey of the Blacksville Compressor Station on 2015-02-03; no construction role is claimed

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on West Uprate and Blacksville Compressor Station Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, West Uprate and Blacksville Compressor Station Expansion Project, Equitrans, L.P. (CP14-492)”. FERC. 29 July 2014. Retrieved 4 October 2026.
  2. “Submission of required noise survey (Blacksville Compressor Station ambient sound monitoring report, February 2015), Equitrans, L.P. (CP14-492)”. Equitrans, L.P. (filed with FERC). 2 March 2015. Retrieved 4 October 2026.
  3. “Notice of Equitrans, L.P.'s 5/23/14 request under Blanket Authorization, uprate of 74 miles and Blacksville Compressor Station (CP14-492)”. FERC. 30 May 2014. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP14-492”. Federal Energy Regulatory Commission. 23 May 2014. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.