White River Header Pipeline is a natural gas pipeline expansion in Colorado, operated by Questar Pipeline. Construction began in 2008. It runs 5.9 miles of 30" pipe.

White River Header Pipeline
Also calledWhite River Hub Hub Project[1]
General information
KindPipeline project[2]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StateColorado[2]
CountiesRio Blanco[3]
Approved1 August 2008[3]
Construction started29 August 2008[4]
In service15 November 2008[2] or 2 December 2008[5][sources disagree]
FERC docketCP08-398[2]
FERC pre-filing docketPF08-3[1]
Contractors
Technical information
Length5.9 mi[2]
Pipe size30 in[2] or 24 in, 30 in[3][sources disagree]
Capacity2565 MMcf/d additional capacity (EIA)[2]
Cost$58 million (EIA estimate; no dollar year given)[2] or approximately $58.3 million total estimated cost[3][sources disagree]
On ProvenHand
Hands listed0

White River Header Pipeline is a natural gas pipeline expansion in Colorado, operated by Questar Pipeline. Construction began in 2008. It runs 5.9 miles of 30" pipe.

Contractorsedit

ContractorWorkScopeYears
Sterling Construction Co.[4][6]PrimePipeline facility contractor: mobilized to the right-of-way and began clearing Aug 29, 2008; did the reclamationfrom 1 August 2008
Schmueser and Associates[4]meter station constructionGreasewood Meter Station contractorfrom 1 August 2008

Inspection

FirmScopeYears
Rocky Mountain Inspection[4]Inspection staff on the pipeline facility (trained with the contractor at its yard, Aug 2008)from 1 August 2008
Uinta Paleontological Associates[4]Provider of paleontological monitors for constructionfrom 1 August 2008
Tetra Tech NUS, Inc.[6]Inspected the project for FERC (Oct 2008)1 October 2008

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $58 million (EIA estimate; no dollar year given)[2]
  • approximately $58.3 million total estimated cost[3]
Diameters
In service
  • 15 November 2008[2]
  • 2 December 2008[5]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on White River Header Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP08-398”. Federal Energy Regulatory Commission. 16 May 2008. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, White River Hub, LLC (CP08-398)”. Federal Energy Regulatory Commission. 1 August 2008. Retrieved 4 October 2026.
  4. “Weekly Construction Progress Report #1, week ending August 30, 2008, White River Hub Project (CP08-398)”. White River Hub, LLC (filed with FERC). 5 September 2008. Retrieved 4 October 2026.
  5. “Notice of Completion of Construction, Acquisition of Facilities and Commencement of Service, White River Hub (CP08-398)”. White River Hub, LLC (filed with FERC). 12 December 2008. Retrieved 4 October 2026.
  6. “Weekly Construction Progress Report, week ending October 25, 2008, White River Hub Project (CP08-398)”. White River Hub, LLC (filed with FERC). 29 October 2008. Retrieved 4 October 2026.