White River Header Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
White River Header Pipeline is a natural gas pipeline expansion in Colorado, operated by Questar Pipeline. Construction began in 2008. It runs 5.9 miles of 30" pipe.
| White River Header Pipeline | |
|---|---|
| Also called | White River Hub Hub Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Colorado[2] |
| Counties | Rio Blanco[3] |
| Approved | 1 August 2008[3] |
| Construction started | 29 August 2008[4] |
| In service | 15 November 2008[2] or 2 December 2008[5][sources disagree] |
| FERC docket | CP08-398[2] |
| FERC pre-filing docket | PF08-3[1] |
| Contractors | |
| Technical information | |
| Length | 5.9 mi[2] |
| Pipe size | 30 in[2] or 24 in, 30 in[3][sources disagree] |
| Capacity | 2565 MMcf/d additional capacity (EIA)[2] |
| Cost | $58 million (EIA estimate; no dollar year given)[2] or approximately $58.3 million total estimated cost[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
White River Header Pipeline is a natural gas pipeline expansion in Colorado, operated by Questar Pipeline. Construction began in 2008. It runs 5.9 miles of 30" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Sterling Construction Co.[4][6] | Prime | Pipeline facility contractor: mobilized to the right-of-way and began clearing Aug 29, 2008; did the reclamation | from 1 August 2008 |
| Schmueser and Associates[4] | meter station construction | Greasewood Meter Station contractor | from 1 August 2008 |
Inspection
| Firm | Scope | Years |
|---|---|---|
| Rocky Mountain Inspection[4] | Inspection staff on the pipeline facility (trained with the contractor at its yard, Aug 2008) | from 1 August 2008 |
| Uinta Paleontological Associates[4] | Provider of paleontological monitors for construction | from 1 August 2008 |
| Tetra Tech NUS, Inc.[6] | Inspected the project for FERC (Oct 2008) | 1 October 2008 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| Diameters | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on White River Header Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-398”. Federal Energy Regulatory Commission. 16 May 2008. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, White River Hub, LLC (CP08-398)”. Federal Energy Regulatory Commission. 1 August 2008. Retrieved 4 October 2026.
- “Weekly Construction Progress Report #1, week ending August 30, 2008, White River Hub Project (CP08-398)”. White River Hub, LLC (filed with FERC). 5 September 2008. Retrieved 4 October 2026.
- “Notice of Completion of Construction, Acquisition of Facilities and Commencement of Service, White River Hub (CP08-398)”. White River Hub, LLC (filed with FERC). 12 December 2008. Retrieved 4 October 2026.
- “Weekly Construction Progress Report, week ending October 25, 2008, White River Hub Project (CP08-398)”. White River Hub, LLC (filed with FERC). 29 October 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.