Wild Trail Project is a natural gas pipeline expansion in Utah, operated by Northwest Pipeline LLC. Construction began in 2026.

Wild Trail Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusApproved[2] or Under construction[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
Operator
StateUtah[2][4][5]
Approved19 March 2026[4][6]
Construction started15 May 2026[3]
FERC docketCP25-497[1]
Technical information
Capacity58 MMcf/d (FERC project list)[4] or 57.96 MMcf/d (FERC project list)[5] or 82.955 MMcf/d additional capacity (EIA)[2] or additional 57,955 Dth/d of northbound firm transportation service[6][sources disagree]
Units added1 × Solar Taurus 70 (gas turbine)[6]
Horsepower added11,110 hp[6]
Costapproximately $77,298,599[6]
On ProvenHand
Hands listed0

Wild Trail Project is a natural gas pipeline expansion in Utah, operated by Northwest Pipeline LLC. Construction began in 2026.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 58 MMcf/d (FERC project list)[4]
  • 57.96 MMcf/d (FERC project list)[5]
  • 82.955 MMcf/d additional capacity (EIA)[2]
  • additional 57,955 Dth/d of northbound firm transportation service[6]
Status
  • Approved[2]
  • Under construction[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Wild Trail Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-497”. Federal Energy Regulatory Commission. 21 May 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Monthly Construction Status Report (04/17/2026 to 05/17/2026), Wild Trail Project (CP25-497)”. Northwest Pipeline LLC (filed with FERC). 18 May 2026. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Order Issuing Certificate, Wild Trail Project (CP25-497)”. Federal Energy Regulatory Commission. 19 March 2026. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.