Willcox Lateral Looping Project

From the ProvenHand pipeline wiki

Willcox Lateral Looping Project is a natural gas pipeline loop in Arizona, operated by El Paso Natural Gas Company, L.L.C.. It was built and entered service in 2013. It runs 11.2 miles of 16" pipe.

Willcox Lateral Looping Project
General information
KindPipeline project[1]
Project typeLoop[2]
StatusIn service[3]
CommodityNatural gas[2]
Owner and operator
StateArizona[2]
CountiesCochise[2]
Approved3 June 2013[4]
Construction started14 October 2013[4]
In service27 December 2013[3]
FERC docketCP13-112[1]
Technical information
Length11.2 mi[2]
Pipe size16"[2]
Costapproximately $16 million[2]
On ProvenHand
Hands listed0

Willcox Lateral Looping Project is a natural gas pipeline loop in Arizona, operated by El Paso Natural Gas Company, L.L.C.. It was built and entered service in 2013. It runs 11.2 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Willcox Lateral Looping Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP13-112”. Federal Energy Regulatory Commission. 26 March 2013. Retrieved 3 October 2026.
  2. “Prior Notice Application, Willcox Lateral Looping Project (CP13-112)”. El Paso Natural Gas Company, L.L.C. (filed with FERC). 26 March 2013. Retrieved 3 October 2026.
  3. “Weekly Status Report No. 12, Willcox Lateral Looping Project (CP13-112)”. El Paso Natural Gas Company, L.L.C. (filed with FERC). 23 January 2014. Retrieved 3 October 2026.
  4. “Weekly Status Report No. 1, Willcox Lateral Looping Project (CP13-112)”. El Paso Natural Gas Company, L.L.C. (filed with FERC). 25 October 2013. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.