Willis Lateral Project
From the ProvenHand pipeline wiki
Willis Lateral Project is a natural gas pipeline lateral in Texas, operated by Gulf South Pipeline Company, LLC. Construction began in 2019 and the line entered service in 2020. It runs 19 miles of 24" pipe.
| Willis Lateral Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility project | |
| State | Texas[1][2] |
| Counties | Liberty, Montgomery, Polk, San Jacinto[4] |
| Approved | 18 July 2019[1] |
| Construction started | August 2019[5] |
| In service | 29 May 2020[2] |
| FERC docket | CP18-525[1] |
| Technical information | |
| Length | 19 mi[1][2] |
| Pipe size | 24"[2] |
| Capacity | 200 MMcf/d (FERC project list)[1][2] |
| Cost | $96.178 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Willis Lateral Project is a natural gas pipeline lateral in Texas, operated by Gulf South Pipeline Company, LLC. Construction began in 2019 and the line entered service in 2020. It runs 19 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Willis Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-525”. Federal Energy Regulatory Commission. 13 July 2018. Retrieved 3 October 2026.
- “Environmental Assessment, Willis Lateral Project (CP18-525)”. FERC staff. 4 March 2019. Retrieved 4 October 2026.
- “Bi-Weekly Report No. 02, Willis Lateral Project (CP18-525)”. Gulf South Pipeline Company, LP (filed with FERC). 6 September 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.