Windy Creek Pipeline Replacement and Lowering Project
From the ProvenHand pipeline wiki
Windy Creek Pipeline Replacement and Lowering Project is a pipeline replacement, operated by Northwest Pipeline LLC.
| Windy Creek Pipeline Replacement and Lowering Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Owner and operator | |
| Counties | Douglas[2] |
| FERC docket | CP07-100[1] |
| Technical information | |
| Pipe size | 10"[2] |
| Cost | approximately $300,000 (Northwest estimate)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Windy Creek Pipeline Replacement and Lowering Project is a pipeline replacement, operated by Northwest Pipeline LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Windy Creek Pipeline Replacement and Lowering Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP07-100”. Federal Energy Regulatory Commission. 9 March 2007. Retrieved 3 October 2026.
- “Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization (Docket No. CP07-100-000), Federal Register E7-5010”. Federal Energy Regulatory Commission (published in the Federal Register). 20 March 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.