Wyoming Interstate Medicine Bow Lateral Expansion is a natural gas pipeline expansion in Alabama and Georgia, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2000.
| Wyoming Interstate Medicine Bow Lateral Expansion | |
|---|---|
| Also called | Transco SouthCoast Expansion[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Alabama, Georgia[1][2] |
| Approved | 22 May 2000[1] |
| In service | 3 November 2000[2] |
| FERC docket | CP99-392[1] |
| Technical information | |
| Length | 44.3 mi[1] or 44 mi[2][sources disagree] |
| Pipe size | 24", 42", 48"[2] |
| Capacity | 204.1 MMcf/d (FERC project list)[1] or 200 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $108 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Wyoming Interstate Medicine Bow Lateral Expansion is a natural gas pipeline expansion in Alabama and Georgia, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2000.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Wyoming Interstate Medicine Bow Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.