16-inch Crude Oil Pipeline - Billings & Stark is a crude oil pipeline loop in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2015. It runs 15 miles of 16" pipe.
| 16-inch Crude Oil Pipeline - Billings & Stark | |
|---|---|
| Also called | Heart River Pipeline[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Loop[1] |
| Status | In service[3] |
| Commodity | Crude oil[1] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | Billings, Stark[1] |
| Approved | 30 September 2015[1] |
| Construction started | 2 November 2015[4] |
| North Dakota PSC case | PU-15-097[2] |
| Contractors | |
| Technical information | |
| Length | 15 mi[1] |
| Pipe size | 16"[1] |
| Cost | total anticipated cost of the Project is approximately $10.4 million[1] |
| On ProvenHand | |
| Hands listed | 0 |
16-inch Crude Oil Pipeline - Billings & Stark is a crude oil pipeline loop in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2015. It runs 15 miles of 16" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Keitu Engineers & Consultants[5] | project management (listed as project manager in the pre-construction minutes) |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 16-inch Crude Oil Pipeline - Billings & Stark? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-15-97 (Bridger 16-inch Heart River Pipeline)”. North Dakota Public Service Commission. 30 September 2015. Retrieved 3 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “As-built Inspection Report, Bridger Heart River Pipeline, PU-15-97”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 3 October 2016. Retrieved 3 October 2026.
- “Construction Inspection Report, Bridger Heart River Pipeline, PU-15-97”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 29 December 2015. Retrieved 3 October 2026.
- “Pre-construction conference minutes (held 2015-10-27), Bridger 16-inch crude oil pipeline, PU-15-97”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 2 November 2015. Retrieved 3 October 2026.