Keitu Engineers & Consultants

From the ProvenHand pipeline wiki

Keitu Engineers & Consultants is a pipeline contractor and a third-party inspection firm.

Keitu Engineers & Consultants
General information
Industry
PLCANot a PLCA member as of 3 October 2026[6]
On ProvenHand
Hands listed0

Keitu Engineers & Consultants is a pipeline contractor and a third-party inspection firm.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkProject built
10-Inch Crude Oil Pipeline - Billings, Dunn, Stark[1]project management (listed as project manager in the pre-construction minutes)2015
16-inch Crude Oil Pipeline - Billings & Stark[2]project management (listed as project manager in the pre-construction minutes)2015

References

  1. “Pre-construction conference minutes (held 2015-01-14), Belle Fourche 10-inch crude pipeline, PU-14-135”. Belle Fourche Pipeline Company (filed with the North Dakota Public Service Commission). 6 October 2015. Retrieved 3 October 2026.
  2. “Pre-construction conference minutes (held 2015-10-27), Bridger 16-inch crude oil pipeline, PU-15-97”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 2 November 2015. Retrieved 3 October 2026.
  3. “North Dakota PSC case PU-14-689 detail and docket index (6-inch NGL Pipeline Project, McKenzie County, Caliber Midstream Partners)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  4. “As-Built Inspection Report, Buddy Domindgo Pipeline, PU-22-141”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 31 May 2023. Retrieved 3 October 2026.
  5. “Construction inspection report, case PU-14-823, docket 46”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 29 July 2015. Retrieved 3 October 2026.
  6. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  7. “Post-Construction Inspection Report, Keene Oil Gathering System, PU-18-024”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 12 November 2019. Retrieved 3 October 2026.
  8. “ND PSC case PU-17-483 docket list: Cherry Creek Pipeline-McKenzie & Williams Counties”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  9. “As-Built Inspection Report, case PU-14-764, docket 158”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 29 December 2023. Retrieved 3 October 2026.
  10. “As-built Inspection Report, DAPL Connector Pipeline Project, PU-16-614”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 6 September 2017. Retrieved 3 October 2026.
  11. “ND PSC case PU-15-725 docket list: Spring Creek Pump Station Project - McKenzie Cnty”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  12. “Post-Construction Inspection Report, Meadowlark 8-inch Crude Oil Pipeline, PU-14-223”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 11 October 2016. Retrieved 3 October 2026.
  13. “ND PSC case PU-22-164 docket list: Amend Cert. No. 209, Permit No. 219”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  14. “Pre-construction meeting conference call minutes (2016-03-24), Dakota Access Pipeline, PU-14-842”. Dakota Access, LLC (filed with the North Dakota Public Service Commission). 24 March 2016. Retrieved 3 October 2026.
  15. “Purchase of service contract for construction inspection, Case No. PU-19-204”. North Dakota Public Service Commission. 23 September 2020. Retrieved 3 October 2026.