Keene Oil Gathering System Conversion - McKenzie

From the ProvenHand pipeline wiki

Keene Oil Gathering System Conversion - McKenzie is a crude oil pipeline conversion in North Dakota, operated by Hess North Dakota Pipelines LLC. Construction began in 2019. It runs 19 miles of 10", 16" pipe.

Keene Oil Gathering System Conversion - McKenzie
General information
KindPipeline project[1]
Project typeConversion[2]
StatusIn service[3]
CommodityCrude oil[2]
Owner and operator
StateNorth Dakota[1]
CountiesMcKenzie[2]
Approved29 May 2018[2]
Construction startedMay 2019[3]
North Dakota PSC casePU-18-024[1]
Technical information
Length19 mi[2]
Pipe size10", 16"[2]
Capacitytransmission pipeline capable of transporting 160,000 barrels per day of crude oil[2]
Costestimated cost of the Project, including the conversion and three booster pumps, is $114 million[2]
On ProvenHand
Hands listed0

Keene Oil Gathering System Conversion - McKenzie is a crude oil pipeline conversion in North Dakota, operated by Hess North Dakota Pipelines LLC. Construction began in 2019. It runs 19 miles of 10", 16" pipe.

Inspection

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Keene Oil Gathering System Conversion - McKenzie? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  2. “Findings of Fact, Conclusions of Law and Order, Case No. PU-18-024 (Hess Keene Oil Gathering System conversion)”. North Dakota Public Service Commission. 29 May 2018. Retrieved 3 October 2026.
  3. “Post-Construction Inspection Report, Keene Oil Gathering System, PU-18-024”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 12 November 2019. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.