8-inch NG Buddy Domindgo Pipeline - Williams Cnty.
From the ProvenHand pipeline wiki
8-inch NG Buddy Domindgo Pipeline - Williams Cnty. is a natural gas pipeline in North Dakota, operated by Continental Resources, Inc.. Construction began in 2022. It runs 3.1 miles of 8" pipe.
| 8-inch NG Buddy Domindgo Pipeline - Williams Cnty. | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | Williams[2] |
| Approved | 6 July 2022[2] |
| Construction started | 16 August 2022[4] |
| North Dakota PSC case | PU-22-141[1] |
| Contractors | |
| Technical information | |
| Length | 3.1 mi[2] |
| Pipe size | 8"[2] |
| Capacity | maximum flow rate capacity of 30 MMSCFD[2] |
| Cost | estimated cost of the Project is $3.55 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
8-inch NG Buddy Domindgo Pipeline - Williams Cnty. is a natural gas pipeline in North Dakota, operated by Continental Resources, Inc.. Construction began in 2022. It runs 3.1 miles of 8" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Core Services[5] | Prime |
| Diamond Resources Co.[5] | right-of-way agent for the operator (listed as ROW Agent in the pre-construction minutes) |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 8-inch NG Buddy Domindgo Pipeline - Williams Cnty.? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-22-141 (Continental Resources Buddy Domindgo 8-inch natural gas pipeline)”. North Dakota Public Service Commission. 6 July 2022. Retrieved 3 October 2026.
- “As-Built Inspection Report, Buddy Domindgo Pipeline, PU-22-141”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 31 May 2023. Retrieved 3 October 2026.
- “Site Inspection Trip Report (topsoil), Buddy Domingo Pipeline, PU-22-141”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 29 August 2022. Retrieved 3 October 2026.
- “Preconstruction conference minutes (2022-07-20), Continental Resources EOR Buddy Domindgo Line, PU-22-141”. Continental Resources, Inc. (filed with the North Dakota Public Service Commission). 20 July 2022. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.