8-Inch Crude Oil Pipeline- Williams & Divide Cntys is a crude oil pipeline conversion in North Dakota, operated by Meadowlark Midstream Company, LLC. It runs 43.5 miles of 8" pipe.
| 8-Inch Crude Oil Pipeline- Williams & Divide Cntys | |
|---|---|
| Also called | Divide Lateral Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Conversion[3] |
| Status | In service[4] |
| Commodity | Crude oil[3] |
| Owner and operator | |
| Owner | |
| State | North Dakota[2] |
| Counties | Divide, Williams[3] |
| Approved | 25 February 2015[3] |
| North Dakota PSC case | PU-14-223[2] |
| Contractors | |
| Technical information | |
| Length | 43.5 mi[3] |
| Pipe size | 8"[3] |
| Capacity | maximum design capacity will be 45,000 barrels of oil per day[3] |
| Cost | total anticipated cost of the Project is approximately $21 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
8-Inch Crude Oil Pipeline- Williams & Divide Cntys is a crude oil pipeline conversion in North Dakota, operated by Meadowlark Midstream Company, LLC. It runs 43.5 miles of 8" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Braun InterTech[1] | onsite contractor, role not mapped | Onsite contractor named in the Keitu construction report (X-ray, quality control or installation role); the extracted text does not map the firm to a role. |
| Chippewa Resources[1] | onsite contractor, role not mapped | Onsite contractor named in the Keitu construction report (X-ray, quality control or installation role); the extracted text does not map the firm to a role. |
| Jones Constructors[1] | onsite contractor, role not mapped | Onsite contractor named in the Keitu construction report (X-ray, quality control or installation role); the extracted text does not map the firm to a role. |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 8-Inch Crude Oil Pipeline- Williams & Divide Cntys? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Construction Inspection Report, Divide Lateral Pipeline Project, PU-14-223”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 30 October 2015. Retrieved 3 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-14-223 (Meadowlark 8-inch crude oil pipeline, Divide Lateral)”. North Dakota Public Service Commission. 25 February 2015. Retrieved 3 October 2026.
- “Post-Construction Inspection Report, Meadowlark 8-inch Crude Oil Pipeline, PU-14-223”. Keitu Engineers & Consultants, Inc. (filed with the North Dakota Public Service Commission). 11 October 2016. Retrieved 3 October 2026.