16-inch Crude Oil Pipeline-McKenzie/Golden Valley

From the ProvenHand pipeline wiki

16-inch Crude Oil Pipeline-McKenzie/Golden Valley is a crude oil pipeline in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2022 and the line entered service in 2023. It runs 80 miles of 16" pipe.

16-inch Crude Oil Pipeline-McKenzie/Golden Valley
Also calledSouth Bend 16-inch Crude Oil Pipeline[1]
General information
KindPipeline project[2]
Project typeNew build[3]
StatusIn service[4]
CommodityCrude oil[3]
Owner and operator
StateNorth Dakota[2]
CountiesGolden Valley, McKenzie[3]
Approved8 June 2022[3]
Construction started22 June 2022[1]
In serviceFebruary 2023[4]
North Dakota PSC casePU-21-048[2]
Contractors
Technical information
Length80 mi[3]
Pipe size16"[3]
Capacityinstalled capacity of 105,000 barrels per day[3]
Costestimated installed cost of the Project is approximately $61 million[3]
On ProvenHand
Hands listed0

16-inch Crude Oil Pipeline-McKenzie/Golden Valley is a crude oil pipeline in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2022 and the line entered service in 2023. It runs 80 miles of 16" pipe.

Contractorsedit

ContractorWorkSpread
Loenbro Construction Company, Inc.[5]PrimeSpread 1
Loenbro Construction Company, Inc.[5]PrimeSpread 2
Tomahawk Pipeline Construction[5]PrimeSpread 3
KLJ[6]project management for the operator (listed as Project Manager in the pre-construction minutes)
Keitu Engineering & Consultants[6]environmental (listed as Environmental in the pre-construction minutes)
Diamond Resources Co.[6]land (listed as Land in the pre-construction minutes)

Inspection

Spreads

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 16-inch Crude Oil Pipeline-McKenzie/Golden Valley? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Topsoil Inspection Report, South Bend 16-inch Crude Oil Pipeline, PU-21-048”. Stantec Consulting Services Inc. (filed with the North Dakota Public Service Commission). 7 July 2022. Retrieved 3 October 2026.
  2. “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  3. “Findings of Fact, Conclusions of Law and Order, Case No. PU-21-048 (Bridger 16-inch South Bend crude oil pipeline)”. North Dakota Public Service Commission. 8 June 2022. Retrieved 3 October 2026.
  4. “As-Built Inspection Report, South Bend 16-inch Crude Oil Pipeline, PU-21-048”. Stantec Consulting Services Inc. (filed with the North Dakota Public Service Commission). 17 May 2023. Retrieved 3 October 2026.
  5. “Construction Inspection Report, South Bend 16-inch Crude Oil Pipeline, PU-21-048”. Stantec Consulting Services Inc. (filed with the North Dakota Public Service Commission). 30 September 2022. Retrieved 3 October 2026.
  6. “Notice of intent to commence construction and pre-construction call minutes (2022-06-10), South Bend 16-inch crude oil pipeline, PU-21-048”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 16 June 2022. Retrieved 3 October 2026.
  7. “Purchase of service contract for construction inspection, Case No. PU-21-048”. North Dakota Public Service Commission. 24 June 2022. Retrieved 3 October 2026.
  8. “South Bend 16-inch crude oil pipeline progress report, status as of 2023-03-31, PU-21-048”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 12 April 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.