KLJ is a pipeline contractor.
| KLJ | |
|---|---|
| General information | |
| Industry | |
| PLCA | Not a PLCA member as of 3 October 2026[3] |
| On ProvenHand | |
| Hands listed | 0 |
KLJ is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Project built |
|---|---|---|
| 16-inch Crude Oil Pipeline-McKenzie/Golden Valley[2] | project management for the operator (listed as Project Manager in the pre-construction minutes) | 2022–2023 |
| Dickinson Bypass Reroute - Stark[1] | project management and engineering for the operator (named in the pre-construction minutes) | 2016 |
References
- “Notice for start of construction and preconstruction conference minutes, Case No. PU-16-95”. Bakken Oil Express, LLC (filed with the North Dakota Public Service Commission). 13 May 2016. Retrieved 3 October 2026.
- “Notice of intent to commence construction and pre-construction call minutes (2022-06-10), South Bend 16-inch crude oil pipeline, PU-21-048”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 16 June 2022. Retrieved 3 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.