2021 Auburn A-line Abandonment and Capacity Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

2021 Auburn A-line Abandonment and Capacity Replacement Project is a natural gas pipeline in Nebraska, operated by Northern Natural Gas Company. Construction began in 2021. It runs 4.4 miles of 8" pipe.

2021 Auburn A-line Abandonment and Capacity Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1] or Loop[2][sources disagree]
StatusIn service[1][3]
CommodityNatural gas[1][4]
Operator
Owner and operator
StateNebraska[1][4]
CountiesJohnson, Lancaster, Nemaha, Otoe[4]
Approved21 January 2021[4]
Construction started5 April 2021[5]
In service11 August 2021[1] or 10 August 2021[3][sources disagree]
FERC docketCP20-479[1]
Contractors
Technical information
Length4.4 mi[1][4]
Pipe size8"[1][4]
Cost$7.7 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

2021 Auburn A-line Abandonment and Capacity Replacement Project is a natural gas pipeline in Nebraska, operated by Northern Natural Gas Company. Construction began in 2021. It runs 4.4 miles of 8" pipe.

Contractorsedit

ContractorWorkSpread
Jomax Construction Co., Inc.[5]PrimeAuburn B-branch line loop

Spreads

SpreadPrime contractorDates
Auburn B-branch line loop[5]Jomax Construction Co., Inc.from 5 April 2021

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
In service
  • 11 August 2021[1]
  • 10 August 2021[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 2021 Auburn A-line Abandonment and Capacity Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP20-479”. Federal Energy Regulatory Commission. 11 June 2020. Retrieved 3 October 2026.
  3. “Notice of In-service, Auburn A-branch line Abandonment and Capacity Replacement Project (CP20-479)”. Northern Natural Gas Company (filed with FERC). 11 August 2021. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Approving Abandonment, Northern Natural Gas Company, 2021 Auburn A-line Abandonment and Capacity Replacement Project (CP20-479)”. FERC. 21 January 2021. Retrieved 3 October 2026.
  5. “Biweekly Environmental Inspector Report #8 (to May 30, 2021), Auburn A-line Abandonment and Capacity Replacement Project (CP20-479)”. Northern Natural Gas Company (filed with FERC). 3 June 2021. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.