Jomax Construction Co., Inc.

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Jomax Construction Co., Inc. is a pipeline contractor based in Great Bend, Kansas. It is part of APi Group, Inc..

Jomax Construction Co., Inc.
Legal nameJomax Construction Company, Inc.[1]
General information
Industry
TypePrivate[1]
StatusActive[1][5][6]
Parent companyAPi Group, Inc.[3][7]
HeadquartersGreat Bend, Kansas, US[1][3][5][6][8]
RegionsAZ,CO,NM,UT,WY, OK,TX, Mexico, IL,IA,KS,MO,NE, MN,ND,SD,WI, Canada[2] or North Dakota, Wyoming, Kansas, Central Oklahoma[9] or Kansas, Oklahoma, Wyoming, North Dakota[10] or western US, Kansas, Colorado, North Dakota, Wyoming, Oklahoma[6][sources disagree]
Websitewww.jomaxconstruction.com[2] or http://www.jomaxconstruction.com/[9][sources disagree]
PLCANot a PLCA member as of 3 October 2026[11]
On ProvenHand
Hands listed0

Jomax Construction Co., Inc. is a pipeline contractor based in Great Bend, Kansas. It is part of APi Group, Inc..

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeSpreadYearsProject built
2021 Auburn A-line Abandonment and Capacity Replacement Project[12]PrimeAuburn B-branch line loop2021
8" NGL & 20" Residue Gas Pipelines - Williams Cnty[13]construction contractor performing the topsoil segregation, named in the PSC inspector's as-built report2020
8" NGL & 20" Residue Gas Pipelines - Williams Cnty[13]PrimeContractor that constructed the pipeline for OE2 North; soil disturbance began 2020-09-01, as-built inspection 2020-12-11from 1 September 20202020
12-Inch NGL Pipeline - McKenzie County[14]topsoil and subsoil removal and segregation, named in the PSC inspector's construction report2019
12-Inch NGL Pipeline - McKenzie County[14]PrimeTopsoil and subsoil removal and segregation along the Little Missouri Lateral right-of-way, soil stripping began 2019-06-18from 18 June 20192019
20-Inch NGL Pipeline - McKenzie County[15]Primeconducted the pipeline construction of all project spreads (PSC inspector's as-built report)2019
8" & 6" NGL Pipelines - McKenzie, Billings, Stark[16]PrimeSouth Segment (Billings and Stark Counties): topsoil removal began 2018-06-20; Jones Contractors worked the North and Fryburg Rail segmentsfrom 20 June 20182018
8" & 6" NGL Pipelines - McKenzie, Billings, Stark[17]PrimeSouth Segment: topsoil removal, trench, pipe installation, backfill and topsoil re-spreading observed through 2018-10-292018
8-Inch NGL Pipeline - McKenzie and Dunn Counties[18]construction contractor listed among the pre-construction meeting attendees (role in the build not stated)2016
8-Inch NGL Pipeline - McKenzie and Dunn Counties[19]PrimeSpread 12016
Lonesome Creek NGL Pipeline Pjct - McKenzie[20]construction contractor listed among the pre-construction meeting attendees (role in the build not stated)2015
White Cliffs Pipeline (original line)[21]PrimeConstruction, Spread #3 (125.83 miles); contract dated 2007-12-04 (SemCrude Pipeline credit agreement, Schedule 4.25 EPC Contracts)Spread #32009
White Cliffs Pipeline (original line)[21]PrimeConstruction, Spread #4 (149.45 miles); contract dated 2007-12-04 (SemCrude Pipeline credit agreement, Schedule 4.25 EPC Contracts)Spread #42009
Badger Pipeline[3]PrimeListed under 2018: 24-inch, Broomfield, CO
Bear Creek Pipeline[3]PrimeListed under 2016: 21 miles of 10-inch and 8-inch, Killdeer, ND
CTC Pipeline[3]PrimeListed under 2019: 23 miles of 16-inch, Douglas, WY
Demicks Lake Pipeline[3]PrimeListed under 2019: 90 miles of 20-inch, ND
Frisco to Bradley[3]PrimeListed under 2018: 27 miles of 24-inch, OK
Glass Mountain Pipeline Extension[3]PrimeListed under 2017: 44 miles of 16-inch, Watonga, OK
Latham Pipeline[3]PrimeListed under 2019: 6- to 24-inch pipe, Weld County, CO
Lonerock Pipeline[3]PrimeListed under 2017: 15 miles of 20-inch, Grady and Canadian Counties, OK
Mustang Pipeline[3]PrimeListed under 2017: 23 miles of 16-inch, Yukon, OK
Northeast Colorado Lateral[22]PrimeConstruction agreement for the Pawnee and Buckingham Lateral Pipelines of the Northeast Colorado Lateral Pipeline, dated 2014-09-23 (effective 2014-08-25), with PXP ColoradoPawnee and Buckingham Laterals
Northline 7[3]PrimeListed under 2019: 93 miles of 20-inch, OK
Sooner to CVJ[3]PrimeListed under 2020: 50 miles of 20-inch, Watonga, OK
Tioga Pipeline[3]PrimeListed under 2020: 100 miles of 16-inch, Tioga, ND
Y-Grade Hub Pipeline[3]PrimeListed under 2018: 59 miles of 16-inch, ND

Spreads

Spreads this company built as the prime contractor.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Regions
  • AZ,CO,NM,UT,WY, OK,TX, Mexico, IL,IA,KS,MO,NE, MN,ND,SD,WI, Canada[2]
  • North Dakota, Wyoming, Kansas, Central Oklahoma[9]
  • Kansas, Oklahoma, Wyoming, North Dakota[10]
  • western US, Kansas, Colorado, North Dakota, Wyoming, Oklahoma[6]
Website
  • www.jomaxconstruction.com[2]
  • http://www.jomaxconstruction.com/[9]

References

  1. “APi Group Corporation 10-K for 2025, Exhibit 21.1 (subsidiaries of the registrant)”. APi Group Corporation (filed with the SEC). 25 February 2026. Retrieved 6 October 2026.
  2. “APCA member directory entry: Jomax Construction Co., Inc.”. American Pipeline Contractors Association. Retrieved 3 October 2026.
  3. “Projects | Jomax Construction Company”. Jomax Construction Company, Inc. Archived from the original on 4 December 2021. Retrieved 3 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  5. “Projects | Jomax Construction Company (June 2025 capture)”. Jomax Construction Company, Inc. 2025. Archived from the original on 12 June 2025. Retrieved 6 October 2026.
  6. “Careers at Jomax Construction Company: Project Manager - Colorado (June 2022 capture)”. Jomax Construction Company, Inc. 2022. Archived from the original on 28 June 2022. Retrieved 6 October 2026.
  7. “APi Group Corporation 10-K for 2020, Exhibit 21.1 (subsidiaries of the registrant)”. APi Group Corporation (filed with the SEC). 24 March 2021. Retrieved 6 October 2026.
  8. “Welcome to the JOMAX web site (2013 capture of the 2011 site)”. Jomax Construction Company, Inc. 2011. Archived from the original on 20 January 2013. Retrieved 6 October 2026.
  9. “Pipeline Construction Services | Jomax Construction (2014 capture)”. Jomax Construction Company, Inc. 2014. Archived from the original on 21 November 2014. Retrieved 6 October 2026.
  10. “Office Locations | Jomax Construction (2014 capture)”. Jomax Construction Company, Inc. 2014. Archived from the original on 22 November 2014. Retrieved 6 October 2026.
  11. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  12. “Biweekly Environmental Inspector Report #8 (to May 30, 2021), Auburn A-line Abandonment and Capacity Replacement Project (CP20-479)”. Northern Natural Gas Company (filed with FERC). 3 June 2021. Retrieved 3 October 2026.
  13. “As-Built Inspection Report, case PU-20-247, docket 58”. Barr (filed with the North Dakota Public Service Commission). 11 January 2021. Retrieved 3 October 2026.
  14. “Topsoil Removal Inspection Report, case PU-19-085, docket 71”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 5 July 2019. Retrieved 3 October 2026.
  15. “As-Built Inspection Report, case PU-18-399, docket 129”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 22 June 2020. Retrieved 4 October 2026.
  16. “Topsoil Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 30 November 2018. Retrieved 3 October 2026.
  17. “Construction Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 15 February 2019. Retrieved 3 October 2026.
  18. “Preconstruction meeting minutes, template letter to landowners, case PU-15-801, docket 38”. Filed with the North Dakota Public Service Commission. 13 April 2016. Retrieved 3 October 2026.
  19. “Topsoil Inspection Report, case PU-15-801, docket 47”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 28 June 2016. Retrieved 3 October 2026.
  20. “Preconstruction call minutes and landowner contact information, case PU-15-137, docket 32”. Filed with the North Dakota Public Service Commission. 25 August 2015. Retrieved 3 October 2026.
  21. “SemGroup Form 10 (May 2010), Exhibit 10.4: SemCrude Pipeline, L.L.C. credit agreement of November 30, 2009, Schedule 4.25 EPC Contracts (White Cliffs)”. SemGroup Corporation (filed with the SEC). 6 May 2010. Retrieved 6 October 2026.
  22. “Tallgrass Energy Partners 8-K of March 2, 2015, Exhibit 10.1 (schedule of contracts, Pony Express Pipeline)”. Tallgrass Energy Partners, LP (filed with the SEC). 2 March 2015. Retrieved 6 October 2026.