Jomax Construction Co., Inc. is a pipeline contractor based in Great Bend, Kansas. It is part of APi Group, Inc..
| Jomax Construction Co., Inc. | |
|---|---|
| Legal name | Jomax Construction Company, Inc.[1] |
| General information | |
| Industry | |
| Type | Private[1] |
| Status | Active[1][5][6] |
| Parent company | APi Group, Inc.[3][7] |
| Headquarters | Great Bend, Kansas, US[1][3][5][6][8] |
| Regions | AZ,CO,NM,UT,WY, OK,TX, Mexico, IL,IA,KS,MO,NE, MN,ND,SD,WI, Canada[2] or North Dakota, Wyoming, Kansas, Central Oklahoma[9] or Kansas, Oklahoma, Wyoming, North Dakota[10] or western US, Kansas, Colorado, North Dakota, Wyoming, Oklahoma[6][sources disagree] |
| Website | www.jomaxconstruction.com[2] or http://www.jomaxconstruction.com/[9][sources disagree] |
| PLCA | Not a PLCA member as of 3 October 2026[11] |
| On ProvenHand | |
| Hands listed | 0 |
Jomax Construction Co., Inc. is a pipeline contractor based in Great Bend, Kansas. It is part of APi Group, Inc..
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| 2021 Auburn A-line Abandonment and Capacity Replacement Project[12] | Prime | Auburn B-branch line loop | 2021 | ||
| 8" NGL & 20" Residue Gas Pipelines - Williams Cnty[13] | construction contractor performing the topsoil segregation, named in the PSC inspector's as-built report | 2020 | |||
| 8" NGL & 20" Residue Gas Pipelines - Williams Cnty[13] | Prime | Contractor that constructed the pipeline for OE2 North; soil disturbance began 2020-09-01, as-built inspection 2020-12-11 | from 1 September 2020 | 2020 | |
| 12-Inch NGL Pipeline - McKenzie County[14] | topsoil and subsoil removal and segregation, named in the PSC inspector's construction report | 2019 | |||
| 12-Inch NGL Pipeline - McKenzie County[14] | Prime | Topsoil and subsoil removal and segregation along the Little Missouri Lateral right-of-way, soil stripping began 2019-06-18 | from 18 June 2019 | 2019 | |
| 20-Inch NGL Pipeline - McKenzie County[15] | Prime | conducted the pipeline construction of all project spreads (PSC inspector's as-built report) | 2019 | ||
| 8" & 6" NGL Pipelines - McKenzie, Billings, Stark[16] | Prime | South Segment (Billings and Stark Counties): topsoil removal began 2018-06-20; Jones Contractors worked the North and Fryburg Rail segments | from 20 June 2018 | 2018 | |
| 8" & 6" NGL Pipelines - McKenzie, Billings, Stark[17] | Prime | South Segment: topsoil removal, trench, pipe installation, backfill and topsoil re-spreading observed through 2018-10-29 | 2018 | ||
| 8-Inch NGL Pipeline - McKenzie and Dunn Counties[18] | construction contractor listed among the pre-construction meeting attendees (role in the build not stated) | 2016 | |||
| 8-Inch NGL Pipeline - McKenzie and Dunn Counties[19] | Prime | Spread 1 | 2016 | ||
| Lonesome Creek NGL Pipeline Pjct - McKenzie[20] | construction contractor listed among the pre-construction meeting attendees (role in the build not stated) | 2015 | |||
| White Cliffs Pipeline (original line)[21] | Prime | Construction, Spread #3 (125.83 miles); contract dated 2007-12-04 (SemCrude Pipeline credit agreement, Schedule 4.25 EPC Contracts) | Spread #3 | 2009 | |
| White Cliffs Pipeline (original line)[21] | Prime | Construction, Spread #4 (149.45 miles); contract dated 2007-12-04 (SemCrude Pipeline credit agreement, Schedule 4.25 EPC Contracts) | Spread #4 | 2009 | |
| Badger Pipeline[3] | Prime | Listed under 2018: 24-inch, Broomfield, CO | |||
| Bear Creek Pipeline[3] | Prime | Listed under 2016: 21 miles of 10-inch and 8-inch, Killdeer, ND | |||
| CTC Pipeline[3] | Prime | Listed under 2019: 23 miles of 16-inch, Douglas, WY | |||
| Demicks Lake Pipeline[3] | Prime | Listed under 2019: 90 miles of 20-inch, ND | |||
| Frisco to Bradley[3] | Prime | Listed under 2018: 27 miles of 24-inch, OK | |||
| Glass Mountain Pipeline Extension[3] | Prime | Listed under 2017: 44 miles of 16-inch, Watonga, OK | |||
| Latham Pipeline[3] | Prime | Listed under 2019: 6- to 24-inch pipe, Weld County, CO | |||
| Lonerock Pipeline[3] | Prime | Listed under 2017: 15 miles of 20-inch, Grady and Canadian Counties, OK | |||
| Mustang Pipeline[3] | Prime | Listed under 2017: 23 miles of 16-inch, Yukon, OK | |||
| Northeast Colorado Lateral[22] | Prime | Construction agreement for the Pawnee and Buckingham Lateral Pipelines of the Northeast Colorado Lateral Pipeline, dated 2014-09-23 (effective 2014-08-25), with PXP Colorado | Pawnee and Buckingham Laterals | ||
| Northline 7[3] | Prime | Listed under 2019: 93 miles of 20-inch, OK | |||
| Sooner to CVJ[3] | Prime | Listed under 2020: 50 miles of 20-inch, Watonga, OK | |||
| Tioga Pipeline[3] | Prime | Listed under 2020: 100 miles of 16-inch, Tioga, ND | |||
| Y-Grade Hub Pipeline[3] | Prime | Listed under 2018: 59 miles of 16-inch, ND |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| 2021 Auburn A-line Abandonment and Capacity Replacement Project | Auburn B-branch line loop[12] | from 5 April 2021 |
| 8-Inch NGL Pipeline - McKenzie and Dunn Counties | Spread 1[19] | |
| Northeast Colorado Lateral | Pawnee and Buckingham Laterals[22] | |
| White Cliffs Pipeline (original line) | Spread #3[21] | |
| White Cliffs Pipeline (original line) | Spread #4[21] |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Regions | |
| Website |
References
- “APi Group Corporation 10-K for 2025, Exhibit 21.1 (subsidiaries of the registrant)”. APi Group Corporation (filed with the SEC). 25 February 2026. Retrieved 6 October 2026.
- “APCA member directory entry: Jomax Construction Co., Inc.”. American Pipeline Contractors Association. Retrieved 3 October 2026.
- “Projects | Jomax Construction Company”. Jomax Construction Company, Inc. Archived from the original on 4 December 2021. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Projects | Jomax Construction Company (June 2025 capture)”. Jomax Construction Company, Inc. 2025. Archived from the original on 12 June 2025. Retrieved 6 October 2026.
- “Careers at Jomax Construction Company: Project Manager - Colorado (June 2022 capture)”. Jomax Construction Company, Inc. 2022. Archived from the original on 28 June 2022. Retrieved 6 October 2026.
- “APi Group Corporation 10-K for 2020, Exhibit 21.1 (subsidiaries of the registrant)”. APi Group Corporation (filed with the SEC). 24 March 2021. Retrieved 6 October 2026.
- “Welcome to the JOMAX web site (2013 capture of the 2011 site)”. Jomax Construction Company, Inc. 2011. Archived from the original on 20 January 2013. Retrieved 6 October 2026.
- “Pipeline Construction Services | Jomax Construction (2014 capture)”. Jomax Construction Company, Inc. 2014. Archived from the original on 21 November 2014. Retrieved 6 October 2026.
- “Office Locations | Jomax Construction (2014 capture)”. Jomax Construction Company, Inc. 2014. Archived from the original on 22 November 2014. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Biweekly Environmental Inspector Report #8 (to May 30, 2021), Auburn A-line Abandonment and Capacity Replacement Project (CP20-479)”. Northern Natural Gas Company (filed with FERC). 3 June 2021. Retrieved 3 October 2026.
- “As-Built Inspection Report, case PU-20-247, docket 58”. Barr (filed with the North Dakota Public Service Commission). 11 January 2021. Retrieved 3 October 2026.
- “Topsoil Removal Inspection Report, case PU-19-085, docket 71”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 5 July 2019. Retrieved 3 October 2026.
- “As-Built Inspection Report, case PU-18-399, docket 129”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 22 June 2020. Retrieved 4 October 2026.
- “Topsoil Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 30 November 2018. Retrieved 3 October 2026.
- “Construction Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 15 February 2019. Retrieved 3 October 2026.
- “Preconstruction meeting minutes, template letter to landowners, case PU-15-801, docket 38”. Filed with the North Dakota Public Service Commission. 13 April 2016. Retrieved 3 October 2026.
- “Topsoil Inspection Report, case PU-15-801, docket 47”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 28 June 2016. Retrieved 3 October 2026.
- “Preconstruction call minutes and landowner contact information, case PU-15-137, docket 32”. Filed with the North Dakota Public Service Commission. 25 August 2015. Retrieved 3 October 2026.
- “SemGroup Form 10 (May 2010), Exhibit 10.4: SemCrude Pipeline, L.L.C. credit agreement of November 30, 2009, Schedule 4.25 EPC Contracts (White Cliffs)”. SemGroup Corporation (filed with the SEC). 6 May 2010. Retrieved 6 October 2026.
- “Tallgrass Energy Partners 8-K of March 2, 2015, Exhibit 10.1 (schedule of contracts, Pony Express Pipeline)”. Tallgrass Energy Partners, LP (filed with the SEC). 2 March 2015. Retrieved 6 October 2026.