8-Inch NGL Pipeline - McKenzie and Dunn Counties is an NGL pipeline in North Dakota, operated by ONEOK Bakken Pipeline, L.L.C.. Construction began in 2016. It runs 38 miles of 8" pipe.
| 8-Inch NGL Pipeline - McKenzie and Dunn Counties | |
|---|---|
| Also called | Bear Creek NGL Pipeline[1] |
| General information | |
| Kind | Pipeline project[2] |
| Commodity | NGL[3] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | Dunn, McKenzie[4] |
| Approved | 23 March 2016[3] |
| Construction started | 21 April 2016[5] |
| North Dakota PSC case | PU-15-801[2] |
| Contractors | |
| Technical information | |
| Length | 38 mi[3] |
| Pipe size | 8"[3] |
| Cost | $45,000,000 estimated investment (PSC siting spreadsheet)[3] |
| On ProvenHand | |
| Hands listed | 0 |
8-Inch NGL Pipeline - McKenzie and Dunn Counties is an NGL pipeline in North Dakota, operated by ONEOK Bakken Pipeline, L.L.C.. Construction began in 2016. It runs 38 miles of 8" pipe.
Contractorsedit
| Contractor | Work | Spread |
|---|---|---|
| Jomax Construction Co., Inc.[1] | construction contractor listed among the pre-construction meeting attendees (role in the build not stated) | |
| Sterling Construction Co.[1] | construction contractor listed among the pre-construction meeting attendees (role in the build not stated) | |
| Site Energy Construction[1] | construction contractor listed among the pre-construction meeting attendees (role in the build not stated) | |
| Jomax Construction Co., Inc.[5] | Prime | Spread 1 |
| Sterling Construction Co.[5] | Prime | Spread 2 |
| Site Energy Construction[5] | Prime | Spread 3 |
Inspection
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 1[5] | Jomax Construction Co., Inc. |
| Spread 2[5] | Sterling Construction Co. |
| Spread 3[5] | Site Energy Construction |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 8-Inch NGL Pipeline - McKenzie and Dunn Counties? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Preconstruction meeting minutes, template letter to landowners, case PU-15-801, docket 38”. Filed with the North Dakota Public Service Commission. 13 April 2016. Retrieved 3 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “North Dakota PSC siting applications spreadsheet (siting cases 2005 to present)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “ND PSC case PU-15-801 docket list: 8-Inch NGL Pipeline - McKenzie and Dunn Counties”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Topsoil Inspection Report, case PU-15-801, docket 47”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 28 June 2016. Retrieved 3 October 2026.
- “Construction Inspection Report, case PU-15-801, docket 53”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 31 August 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.