8" & 6" NGL Pipelines - McKenzie, Billings, Stark
From the ProvenHand pipeline wiki
8" & 6" NGL Pipelines - McKenzie, Billings, Stark is an NGL pipeline in North Dakota, operated by Andeavor Field Services LLC. Construction began in 2018.
| 8" & 6" NGL Pipelines - McKenzie, Billings, Stark | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Commodity | NGL[2] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | Billings, McKenzie, Stark[2] |
| Approved | 13 June 2018[2] |
| Construction started | 20 June 2018[4] |
| North Dakota PSC case | PU-18-072[1] |
| Contractors | |
| Technical information | |
| Pipe size | 6", 8"[2] |
| Cost | estimated cost of the Project is $46 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
8" & 6" NGL Pipelines - McKenzie, Billings, Stark is an NGL pipeline in North Dakota, operated by Andeavor Field Services LLC. Construction began in 2018.
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| Jomax Construction Co., Inc.[5] | Prime | South Segment (Billings and Stark Counties): topsoil removal began 2018-06-20; Jones Contractors worked the North and Fryburg Rail segments | from 20 June 2018 | |
| Jones Contractors[4] | Prime | North Segment | ||
| Jones Contractors[4] | Prime | Fryburg Rail Segment | ||
| Jomax[4] | Prime | South Segment | ||
| EDK Engineering[6] | engineering (listed among Andeavor's contractors) | |||
| Carlson McCain[6] | environmental engineering (listed among Andeavor's contractors) | |||
| G&P Land[6] | right-of-way (listed as a ROW contractor) | |||
| LW Survey[6] | Survey | |||
| Jomax Construction Co., Inc.[4] | Prime | South Segment: topsoil removal, trench, pipe installation, backfill and topsoil re-spreading observed through 2018-10-29 |
Inspection
Spreads
| Spread | Prime contractor |
|---|---|
| Fryburg Rail Segment[4] | Jones Contractors |
| North Segment[2] | Jones Contractors |
| South Segment[2] | Jomax |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 8" & 6" NGL Pipelines - McKenzie, Billings, Stark? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-18-72 (Andeavor 8-inch and 6-inch NGL pipelines)”. North Dakota Public Service Commission. 13 June 2018. Retrieved 3 October 2026.
- “Reclamation Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 8 September 2020. Retrieved 3 October 2026.
- “Construction Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 15 February 2019. Retrieved 3 October 2026.
- “Topsoil Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 30 November 2018. Retrieved 3 October 2026.
- “Memorandum of pre-construction conference call, Andeavor NGL pipelines, PU-18-72”. Andeavor Field Services LLC (filed with the North Dakota Public Service Commission). 19 June 2018. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.