8" & 6" NGL Pipelines - McKenzie, Billings, Stark is an NGL pipeline in North Dakota, operated by Andeavor Field Services LLC. Construction began in 2018.

8" & 6" NGL Pipelines - McKenzie, Billings, Stark
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[3]
CommodityNGL[2]
Owner and operator
StateNorth Dakota[1]
CountiesBillings, McKenzie, Stark[2]
Approved13 June 2018[2]
Construction started20 June 2018[4]
North Dakota PSC casePU-18-072[1]
Contractors
Technical information
Pipe size6", 8"[2]
Costestimated cost of the Project is $46 million[2]
On ProvenHand
Hands listed0

8" & 6" NGL Pipelines - McKenzie, Billings, Stark is an NGL pipeline in North Dakota, operated by Andeavor Field Services LLC. Construction began in 2018.

Contractorsedit

ContractorWorkScopeSpreadYears
Jomax Construction Co., Inc.[5]PrimeSouth Segment (Billings and Stark Counties): topsoil removal began 2018-06-20; Jones Contractors worked the North and Fryburg Rail segmentsfrom 20 June 2018
Jones Contractors[4]PrimeNorth Segment
Jones Contractors[4]PrimeFryburg Rail Segment
Jomax[4]PrimeSouth Segment
EDK Engineering[6]engineering (listed among Andeavor's contractors)
Carlson McCain[6]environmental engineering (listed among Andeavor's contractors)
G&P Land[6]right-of-way (listed as a ROW contractor)
LW Survey[6]Survey
Jomax Construction Co., Inc.[4]PrimeSouth Segment: topsoil removal, trench, pipe installation, backfill and topsoil re-spreading observed through 2018-10-29

Inspection

Spreads

SpreadPrime contractor
Fryburg Rail Segment[4]Jones Contractors
North Segment[2]Jones Contractors
South Segment[2]Jomax

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 8" & 6" NGL Pipelines - McKenzie, Billings, Stark? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  2. “Findings of Fact, Conclusions of Law and Order, Case No. PU-18-72 (Andeavor 8-inch and 6-inch NGL pipelines)”. North Dakota Public Service Commission. 13 June 2018. Retrieved 3 October 2026.
  3. “Reclamation Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 8 September 2020. Retrieved 3 October 2026.
  4. “Construction Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 15 February 2019. Retrieved 3 October 2026.
  5. “Topsoil Inspection Report, Andeavor NGL Pipeline Project, PU-18-72”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 30 November 2018. Retrieved 3 October 2026.
  6. “Memorandum of pre-construction conference call, Andeavor NGL pipelines, PU-18-72”. Andeavor Field Services LLC (filed with the North Dakota Public Service Commission). 19 June 2018. Retrieved 3 October 2026.