Adelphia Gateway Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Adelphia Gateway Pipeline is a natural gas pipeline conversion in Delaware and Pennsylvania, operated by Adelphia Gateway, LLC. It runs 4.8 miles of 18", 20" pipe.

Adelphia Gateway Pipeline
General information
KindPipeline project[1]
Project typeConversion[2][3]
StatusIn service[2][4]
CommodityNatural gas[2][5]
Owner and operator
Operator
StatesDelaware, Pennsylvania[1][2][5]
CountiesBucks, Chester, Delaware, Montgomery, Northampton[3]
Approved20 December 2019[1][5]
In service16 December 2022[2][3] or 20 December 2022[4][sources disagree]
FERC docketCP18-46[1]
Contractors
Technical information
Length4.8 mi[1][2]
Pipe size18 in, 20 in[2][3] or 16 in, 18 in[5][sources disagree]
Capacity850 MMcf/d (FERC project list)[1][2]
Cost$143 million (EIA estimate; no dollar year given)[2] or $331,965,085 estimated total cost, including $189,000,000 to acquire the existing system[5][sources disagree]
On ProvenHand
Hands listed0

Adelphia Gateway Pipeline is a natural gas pipeline conversion in Delaware and Pennsylvania, operated by Adelphia Gateway, LLC. It runs 4.8 miles of 18", 20" pipe.

Contractorsedit

ContractorWorkScopeYears
The Hillis Group, LLC[6]Stormwater system at compressor stationQuakertown, PA: underground stormwater storage and filtration system for a new natural gas compressor station1 May 2022

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $143 million (EIA estimate; no dollar year given)[2]
  • $331,965,085 estimated total cost, including $189,000,000 to acquire the existing system[5]
Diameters
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Adelphia Gateway Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Ongoing Projects: Construction Underway (Pipeline News, January 2023)”. Pipeline News. January 2023. Retrieved 3 October 2026.
  4. “Notice of Commencement of Service of Remaining Project Facilities, Adelphia Gateway, LLC (CP18-46)”. Adelphia Gateway, LLC (filed with FERC). 28 December 2022. Retrieved 4 October 2026.
  5. “Order Issuing Certificates, Adelphia Gateway, LLC, Adelphia Gateway Project (CP18-46 et al.)”. FERC. 20 December 2019. Retrieved 4 October 2026.
  6. “Adelphia Gateway - Quakertown - The Hillis Group, LLC”. The Hillis Group, LLC. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.