Calcasieu Pass LNG Terminal
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Calcasieu Pass LNG Terminal is a natural gas pipeline in Louisiana, operated by Venture Global Calcasieu Pass, LLC. It entered service in 2025.
| Calcasieu Pass LNG Terminal | |
|---|---|
| General information | |
| Kind | Pipeline project[1] or Facility project[2][sources disagree] |
| Project type | New build[2] |
| Status | In service[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Cameron[2] |
| Approved | 21 February 2019[2][4] |
| In service | 3 April 2025[1] |
| FERC docket | CP15-550[4] |
| Doe lng dockets | 13-69-LNG[5], 14-88-LNG[5], 15-25-LNG[5] |
| Contractors | |
| Technical information | |
| LNG trains added | 18[6] |
| Liquefaction added | 10 MTPA[2] |
| On ProvenHand | |
| Hands listed | 0 |
Calcasieu Pass LNG Terminal is a natural gas pipeline in Louisiana, operated by Venture Global Calcasieu Pass, LLC. It entered service in 2025.
Contractorsedit
| Contractor | Work | Prime or sub | Scope |
|---|---|---|---|
| Kiewit Louisiana Co.[6][7] | Prime | EPC contractor for the 10 MTPA export terminal: design, engineering, construction, commissioning and testing | |
| Siemens[8] | Boil-off gas compressor packages (equipment supplier) | Under Kiewit Louisiana Co. | Supplied two centrifugal and one reciprocating boil-off gas compressor packages, selected by the EPC contractor |
| CB&I Storage Tank Solutions[9] | LNG storage tank construction | Constructing the two 200,000 cubic meter LNG storage tanks (first tank roof air-raised April 2020) | |
| Weeks Marine[9] | Marine perimeter wall and levee | Built the marine perimeter wall (with access road gates) and levee together with the EPC contractor | |
| Baker Hughes[6] | Liquefaction and power equipment supplier | Supplies liquefaction and power systems; long-term service agreement guaranteeing minimum performance and availability |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Calcasieu Pass LNG Terminal? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Approval to Commence Service of the remainder of the facilities, Calcasieu Pass LNG Terminal (CP15-550)”. FERC. 3 April 2025. Retrieved 3 October 2026.
- “Order Granting Authorizations under Sections 3 and 7 of the Natural Gas Act, Venture Global Calcasieu Pass, LLC and TransCameron Pipeline, LLC (CP15-550, CP15-551)”. FERC. 21 February 2019. Retrieved 3 October 2026.
- “FERC eLibrary docket CP15-550”. Federal Energy Regulatory Commission. 4 September 2015. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Venture Global, Inc. prospectus (Rule 424(b)(4))”. Venture Global, Inc. (SEC EDGAR). 23 January 2025. Retrieved 3 October 2026.
- “Kiewit awarded EPC contract for Calcasieu Pass LNG project”. LNG Industry. 7 December 2018. Retrieved 3 October 2026.
- “Siemens lands compressor contract for Venture Global in Louisiana”. World Oil. 20 February 2020. Retrieved 3 October 2026.
- “Venture Global LNG celebrates Calcasieu Pass project milestones”. LNG Industry. 27 April 2020. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.