Baker Hughes

From the ProvenHand pipeline wiki

Baker Hughes is a pipeline contractor.

Baker Hughes
General information
Industry
PLCANot a PLCA member as of 3 October 2026[4]
On ProvenHand
Hands listed0

Baker Hughes is a pipeline contractor.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeProject built
Calcasieu Pass LNG Terminal[5]Liquefaction and power equipment supplierSupplies liquefaction and power systems; long-term service agreement guaranteeing minimum performance and availability2025
Rio Grande LNG Expansion[3]Equipment supplier (reservation agreement)Main refrigeration compressors for Train 6
VG CP2 Expansion[1][2]Owner-furnished equipment vendorLiquefaction area: six liquefaction blocks (SMR modules, compressors, cold boxes, air coolers)
VG Plaquemines LNG Expansion[6]Equipment supplier (modular liquefaction)Four liquefaction blocks (eight electric-motor-driven SMR modules) with compression, cold boxes, air coolers and controls

References

  1. “Joint application under NGA sections 3 and 7 for the CP2 LNG Expansion Project (incl. Pipeline Exhibit K, Resource Reports 1 and 9)”. Venture Global CP2 LNG, LLC and Venture Global CP Express, LLC (filed with FERC). 26 May 2026. Retrieved 3 October 2026.
  2. “Baker Hughes Wins CP2 LNG Expansion Technology Contract”. Pipeline & Gas Journal. 28 July 2026. Retrieved 3 October 2026.
  3. “NextDecade Corporation Form 10-Q for the quarter ended June 30, 2026”. NextDecade Corporation (SEC EDGAR). 30 July 2026. Retrieved 3 October 2026.
  4. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  5. “Venture Global, Inc. prospectus (Rule 424(b)(4))”. Venture Global, Inc. (SEC EDGAR). 23 January 2025. Retrieved 3 October 2026.
  6. “Baker Hughes and Venture Global Advance Next Phase of U.S. Gas Infrastructure Growth”. Baker Hughes (GlobeNewswire). 13 September 2026. Retrieved 3 October 2026.