VG CP2 Expansion is a natural gas facility project at CP2 LNG in Louisiana, operated by Venture Global CP2 LNG, LLC.
| VG CP2 Expansion | |
|---|---|
| Also called | CP2 LNG Expansion Project[1], CP2 Expansion Project[2], CP2 Phase 3[3] |
| General information | |
| Kind | Facility project[4] |
| Project type | Added train[1] |
| Status | Proposed[1][5] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| Facility | CP2 LNG[5] |
| State | Louisiana[1][5] |
| Counties | Cameron[1] |
| FERC docket | CP26-530[4] |
| Contractors | |
| Technical information | |
| Capacity added | 1.62 Bcfd (FERC LNG map, Sep 2026)[5] |
| Liquefaction added | 11.7 MTPA[1] |
| On ProvenHand | |
| Hands listed | 0 |
VG CP2 Expansion is a natural gas facility project at CP2 LNG in Louisiana, operated by Venture Global CP2 LNG, LLC.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Baker Hughes[3][7] | Owner-furnished equipment vendor | Liquefaction area: six liquefaction blocks (SMR modules, compressors, cold boxes, air coolers) |
| Linde[3] | Owner-furnished equipment vendor | Nitrogen rejection unit |
| Audubon Engineering[3] | Owner-furnished equipment vendor | LNG expanders |
| UOP[3] | Owner-furnished equipment vendor | Pretreatment area (listed jointly as UOP/Burns & McDonnell Engineering) |
| Burns & McDonnell Engineering[3] | Owner-furnished equipment vendor | Pretreatment area (listed jointly as UOP/Burns & McDonnell Engineering) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on VG CP2 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed CP2 LNG Expansion Project (CP26-530-000, CP26-533-000)”. Federal Energy Regulatory Commission. 12 August 2026. Retrieved 3 October 2026.
- “Venture Global, Inc. Form 10-Q for the quarter ended June 30, 2026”. Venture Global, Inc. (SEC EDGAR). 11 August 2026. Retrieved 3 October 2026.
- “Joint application under NGA sections 3 and 7 for the CP2 LNG Expansion Project (incl. Pipeline Exhibit K, Resource Reports 1 and 9)”. Venture Global CP2 LNG, LLC and Venture Global CP Express, LLC (filed with FERC). 26 May 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-530”. Federal Energy Regulatory Commission. 26 May 2026. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Notice of Application and Establishing Intervention Deadline (CP26-530-000, CP26-533-000)”. Federal Energy Regulatory Commission. 9 June 2026. Retrieved 3 October 2026.
- “Baker Hughes Wins CP2 LNG Expansion Technology Contract”. Pipeline & Gas Journal. 28 July 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.