Cana STACK Expansion Project is a natural gas pipeline expansion in Oklahoma, operated by Enable Gas Transmission, LLC. It entered service in 2018.

Cana STACK Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateOklahoma[1][3]
CountiesGrady, McClain[3]
In serviceOctober 2018[1]
FERC docketCP18-9[1]
Technical information
Pipe size12"[1]
Capacity205 MMcf/d additional capacity (EIA)[1]
Horsepower added10,000 hp[3]
Cost$31.5 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Cana STACK Expansion Project is a natural gas pipeline expansion in Oklahoma, operated by Enable Gas Transmission, LLC. It entered service in 2018.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cana STACK Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP18-9”. Federal Energy Regulatory Commission. 18 October 2017. Retrieved 3 October 2026.
  3. “Notice of Request under Blanket Authorization, Enable Gas Transmission, LLC, Cana Stack Expansion Project (CP18-9)”. FERC (public notice, eLibrary). 27 October 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.