Enable Gas Transmission, LLC

From the ProvenHand pipeline wiki

Enable Gas Transmission, LLC is a pipeline owner-operator based in Houston, Texas.

Enable Gas Transmission, LLC
Legal nameENABLE GAS TRANSMISSION, LLC[1]
General information
Industry
Predecessor
HeadquartersHouston, Texas[1]
PHMSA operator ID602[2]
Texas RRC operator number (P-5)251667[2]
On ProvenHand
Hands listed0

Enable Gas Transmission, LLC is a pipeline owner-operator based in Houston, Texas.

This company article is a stub. You can help ProvenHand by expanding it.

Pipeline systems and facilities

14 systems and facilities this company owned or operated, current ones first.

System or facilityKindStateRole
Ada[4]Underground storageOKOperator
Ada Storage Compressor Station[5]Compressor stationOKOperator
Allen Compressor Station[5]Compressor stationOKOperator
Amber Junction Compressor Station[5]Compressor stationOKOperator
Byars Lake Compressor Station[5]Compressor stationOKOperator
Chiles Dome[4]Underground storageOKOperator
Enable Gas Transmission[1]Pipeline systemAR, KS, LA, MO, MS, OK, TN, TXOperator
Enable Gas Transmission Custer Compressor Station[5]Compressor stationOKOperator
Enable Gas Transmission East Texas[6]Pipeline systemTXOperator
Poteau Compressor Station[5]Compressor stationOKOperator
Red Moon Compressor Station[5]Compressor stationOKOperator
Red Oak 1 Compressor Station[5]Compressor stationOKOperator
Ruston[4]Underground storageLAOperator
Southeast Spiro Compressor Station[5]Compressor stationOKOperator

Projects

As owner or operator

ProjectRoleStatusYearsProject built
Gulf Run Pipeline[3]OperatorIn service2022
JM-44 Nucor Pipeline Project[7]Owner and operatorIn service2021
MASS Project[3]OperatorIn service2020–2021
MASS Project[8]Owner and operatorIn service2020–2021
JM-22 MAOP Reduction Project[9]Owner and operatorIn service2019
Allen Compressor Station Modification Project[3]OperatorIn service2018
Allen Compressor Station Modification Project[10]Owner and operatorIn service2018
Cana STACK Expansion Project[3]OperatorIn service2018
Cana STACK Expansion Project[11]Owner and operatorIn service2018
Project Wildcat[3]OperatorIn service2018
Bradley Lateral Project[12]Owner and operatorIn service2015
Ruston Compressor Station Replacement Project[13]OperatorUnder constructionfrom 30 July 20132012
Central Arkansas Pipeline Enhancement Project[14]Owner and operator
Clarksville Lateral Project[2][15]Owner and operator
Enable Gas Transmission CP20-492[16]Operator
Enable Gas Transmission CP20-492[17]Owner and operator
Line CP Modifications Project[18]Owner and operator

References

  1. “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP26-573”. Federal Energy Regulatory Commission. 1 September 2026. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “EIA map layer: Natural Gas Underground Storage (NaturalGas_UndergroundStorage_US_202012)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  5. “Oklahoma DEQ: 2024 Point Source Emissions”. Oklahoma Department of Environmental Quality. Retrieved 3 October 2026.
  6. “Railroad Commission of Texas: Pipeline Layers by County (digital map data)”. Railroad Commission of Texas. 3 October 2026. Retrieved 3 October 2026.
  7. “FERC eLibrary docket CP21-477”. Federal Energy Regulatory Commission. 22 July 2021. Retrieved 3 October 2026.
  8. “FERC eLibrary docket CP20-482”. Federal Energy Regulatory Commission. 17 June 2020. Retrieved 3 October 2026.
  9. “FERC eLibrary docket CP19-178”. Federal Energy Regulatory Commission. 16 April 2019. Retrieved 3 October 2026.
  10. “FERC eLibrary docket CP18-490”. Federal Energy Regulatory Commission. 24 May 2018. Retrieved 3 October 2026.
  11. “FERC eLibrary docket CP18-9”. Federal Energy Regulatory Commission. 18 October 2017. Retrieved 3 October 2026.
  12. “FERC eLibrary docket CP14-503”. Federal Energy Regulatory Commission. 20 June 2014. Retrieved 3 October 2026.
  13. “Final Weekly Status Report (August 30 to September 5, 2013), Ruston Storage Compressor Replacement Project, Enable Gas Transmission, LLC (CP12-467)”. Enable Gas Transmission, LLC (filed with FERC). 6 September 2013. Retrieved 4 October 2026.
  14. “FERC eLibrary docket CP14-23”. Federal Energy Regulatory Commission. 26 November 2013. Retrieved 3 October 2026.
  15. “Notice of Request Under Blanket Authorization an Establishing Intervention and Protest Deadline re Enable Gas Transmission, LLC's Clarksville Lateral Project under CP26-573.”. Federal Energy Regulatory Commission (staff document). 14 September 2026. Retrieved 3 October 2026.
  16. “Enable Gas Transmission, LLC; Notice of Request Under Blanket Authorization (CP20-492)”. Federal Energy Regulatory Commission (Federal Register notice). 16 July 2020. Retrieved 4 October 2026.
  17. “FERC eLibrary docket CP20-492”. Federal Energy Regulatory Commission. 2 July 2020. Retrieved 3 October 2026.
  18. “FERC eLibrary docket CP20-68”. Federal Energy Regulatory Commission. 28 February 2020. Retrieved 3 October 2026.