Central Arkansas Pipeline Enhancement Project

From the ProvenHand pipeline wiki

Central Arkansas Pipeline Enhancement Project is a natural gas pipeline replacement in Arkansas, operated by Enable Gas Transmission, LLC. It runs 28.5 miles of 4", 12" pipe.

Central Arkansas Pipeline Enhancement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
CommodityNatural gas[2]
Owner and operator
StateArkansas[2]
CountiesFaulkner, Pulaski[2]
Approved17 July 2014[3]
FERC docketCP14-23[1]
Technical information
Length28.5 mi[2]
Pipe size4", 12"[2]
Cost$55,215,132[2]
On ProvenHand
Hands listed0

Central Arkansas Pipeline Enhancement Project is a natural gas pipeline replacement in Arkansas, operated by Enable Gas Transmission, LLC. It runs 28.5 miles of 4", 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Central Arkansas Pipeline Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP14-23”. Federal Energy Regulatory Commission. 26 November 2013. Retrieved 3 October 2026.
  2. “Environmental Assessment Report, Enable Gas Transmission Central Arkansas Pipeline Enhancement Project (CP14-23)”. FERC. 15 April 2014. Retrieved 4 October 2026.
  3. “Order approving abandonment and issuing certificate, Enable Gas Transmission (CP14-23)”. FERC. 17 July 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.