Ruston Compressor Station Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Ruston Compressor Station Replacement Project is a natural gas facility project in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.

Ruston Compressor Station Replacement Project
Also calledRuston Storage Compressor Replacement Project[1]
General information
KindFacility project[2]
Project typeRebuild[2]
StatusUnder construction[3] or In service[4][sources disagree]
CommodityNatural gas[5]
Operator
Owner and operator
StateLouisiana[1]
CountiesLincoln[1]
Construction started4 September 2012[3]
FERC docketCP12-467[2]
Technical information
Units added1 × Caterpillar 3616 (compressor package)[1]
Cost$13.9 M[1]
On ProvenHand
Hands listed0

Ruston Compressor Station Replacement Project is a natural gas facility project in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status
  • Under construction[3]
  • In service[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Ruston Compressor Station Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Ruston Storage Compressor Replacement Project, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. FERC. 24 July 2012. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP12-467”. Federal Energy Regulatory Commission. 22 May 2012. Retrieved 3 October 2026.
  3. “Environmental Inspector's Weekly Report (September 4 to 27, 2012), Ruston Storage Compressor Replacement Project, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 28 September 2012. Retrieved 4 October 2026.
  4. “Final Weekly Status Report (August 30 to September 5, 2013), Ruston Storage Compressor Replacement Project, Enable Gas Transmission, LLC (CP12-467)”. Enable Gas Transmission, LLC (filed with FERC). 6 September 2013. Retrieved 4 October 2026.
  5. “Notice of request under Blanket Authorization, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. FERC. 4 June 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.