Ruston Compressor Station Replacement Project
From the ProvenHand pipeline wiki
Ruston Compressor Station Replacement Project is a natural gas facility project in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.
| Ruston Compressor Station Replacement Project | |
|---|---|
| Also called | Ruston Storage Compressor Replacement Project[1] |
| General information | |
| Kind | Facility project[2] |
| Project type | Rebuild[2] |
| Status | Under construction[3] or In service[4][sources disagree] |
| Commodity | Natural gas[5] |
| Operator |
|
| Owner and operator | |
| State | Louisiana[1] |
| Counties | Lincoln[1] |
| Construction started | 4 September 2012[3] |
| FERC docket | CP12-467[2] |
| Technical information | |
| Units added | 1 × Caterpillar 3616 (compressor package)[1] |
| Cost | $13.9 M[1] |
| On ProvenHand | |
| Hands listed | 0 |
Ruston Compressor Station Replacement Project is a natural gas facility project in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ruston Compressor Station Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Ruston Storage Compressor Replacement Project, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. FERC. 24 July 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP12-467”. Federal Energy Regulatory Commission. 22 May 2012. Retrieved 3 October 2026.
- “Environmental Inspector's Weekly Report (September 4 to 27, 2012), Ruston Storage Compressor Replacement Project, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 28 September 2012. Retrieved 4 October 2026.
- “Final Weekly Status Report (August 30 to September 5, 2013), Ruston Storage Compressor Replacement Project, Enable Gas Transmission, LLC (CP12-467)”. Enable Gas Transmission, LLC (filed with FERC). 6 September 2013. Retrieved 4 October 2026.
- “Notice of request under Blanket Authorization, CenterPoint Energy Gas Transmission Company, LLC (CP12-467)”. FERC. 4 June 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.