JM-22 MAOP Reduction Project
From the ProvenHand pipeline wiki
JM-22 MAOP Reduction Project is a natural gas pipeline in Arkansas, operated by Enable Gas Transmission, LLC. Construction began in 2019.
| JM-22 MAOP Reduction Project | |
|---|---|
| General information | |
| Status | In service[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Arkansas[2] |
| Counties | Monroe[2] |
| Construction started | 12 August 2019[4] |
| FERC docket | CP19-178[3] |
| On ProvenHand | |
| Hands listed | 0 |
JM-22 MAOP Reduction Project is a natural gas pipeline in Arkansas, operated by Enable Gas Transmission, LLC. Construction began in 2019.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on JM-22 MAOP Reduction Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Final Environmental Inspector weekly report, JM-22 MAOP Reduction Project (CP19-178)”. Enable Gas Transmission, LLC (filed with FERC). 18 September 2019. Retrieved 4 October 2026.
- “Notice of Request Under Blanket Authorization, Enable Gas Transmission, LLC (CP19-178)”. Federal Energy Regulatory Commission. 26 April 2019. Retrieved 4 October 2026.
- “FERC eLibrary docket CP19-178”. Federal Energy Regulatory Commission. 16 April 2019. Retrieved 3 October 2026.
- “Weekly status report, JM-22 MAOP Reduction Project (CP19-178)”. Enable Gas Transmission, LLC (filed with FERC). 14 August 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.